Fluid monitoring system - Application solution
8
6.1 Pin assignment of the IO-Link master
AL1300 / AL1320 / AL1330 / AL1340
2
1
4
3
6
5
8
7
1:
Fieldbus (optional)
2:
Fieldbus (optional)
3: Power supply
4: IoT interface to the industrial PC with LR DEVICE
5: SM6000
6: TA2405
7: not connected
8: not connected
AL1350
2
1
3
5
4
7
6
1: IoT interface to the industrial PC with LR DEVICE
2: not connected
3: Power supply
4: SM6000
5: TA2405
6: not connected
7: not connected
6.2 Wiring diagram industrial PC
1
2 3 4
5 6
7
V+V-
1: Power supply
2: Display port
3: VGA socket
4: HDMI interface
5: Ethernet interface 2
6: Ethernet interface 1
7: USB ports
7 Set-up
When the operating voltage has been switched on, the components of the application solution work
with the factory settings. The LEDs show the status of the devices and interfaces (→ Instructions of the
individual components).