background image

3

UK

Connection PAAS M12

1

2

4

3

5

PE

PE

2

1

2

2

1

2

M12 socket

Pin

AS-i +

1

0V

2

AS-i -

3

+24 V

4

PE

5

Version PAAS M12

Insert the AS-i flat cable (yellow) into the cable duct „Line 1“ and the 24 V flat 
cable (black) into the cable duct „Line 2“. Correctly position the cables into the 
profile slot. Connect the PE wire to the screws (2) with earth springs.

Mounting of the upper part

Place the upper part and tighten the screws (2) (screws are supplied).

Fixing upper part/lower part

2

1

2

2

1

2

Reviews: