background image

T H E   POWE R FAM I LY

Your IDM par tner

Always there for you.

IDM HEADQUARTERS IN EASTERN TYROL, AUSTRIA

IDM ENERGIESYSTEME GMBH   

Seblas 16 – 18   A-9971 Matrei in Osttirol, Austria
Tel43(0)4875.6172 - 0   Fax +43(0)4875.6172 - 85   
E-mail [email protected]

w w w. i d m - e n e r g i e . c o m

IDM - ser vice technology

COMMISSIONING 

– SERVICING – ON-SITE SERVICE

Our ser vice technicians are happy to help on-site. Contact 
details for your regional customer ser vice centre can be 
found on our website

 

w w w.idm- energie.com

.

IDM Academy

PRACTICAL KNOWLEDGE FOR SALES AND TECHNOLOGY

The comprehensive range of seminars for specialists at the 

IDM POWER FAMILY is available to you at all times on our 
website

 

w w w.idm- energie.com

. We look for ward to 

receiving your registration. 

ONE STEP AHEAD

*

T

H E

 

POWE R

 

FAM I LY

© IDM ENERGIESYSTEME GMBH Matrei i. Osttirol 22.10.15 · Errors and omission excepted

T H E   POWE R FAM I LY

Your IDM par tner

IDM HEADQUARTERS IN EASTERN TYROL, AUSTRIA

IDM ENERGIESYSTEME GMBH

Seblas 16 – 18   A-9971 Matrei in Osttirol, Austria
Tel43(0)4875.6172 - 0   Fax +43(0)4875.6172 - 85   
E-mail [email protected]

w w w. i d m - e n e r g i e . c o m

IDM Academy

Summary of Contents for AQA 300

Page 1: ...Translation of original instruction Ausgabe 22 10 15 THE POWER FAMILY w w w i d m e n e r g i e c o m Technical documentation Installation instructions Hot water tank for drink water preparation AQA...

Page 2: ...T H E P OW E R FA M I L Y C IDM ENERGIESYSTEME GMBH 2 Installation Instruction Hygienik 2 1 2 3 4 5 6 1 2 3 4 5 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 Contents Contents...

Page 3: ...al data AQA 300 AQA 500 8 3 2 Dimensional drawings AQA 300 AQA 500 9 4 INSTALLATION 10 4 1 Setup conditions AQA 300 AQA 500 10 4 2 Setup location AQA 300 AQA 500 10 4 3 Connecting sleeves Hygienik 10...

Page 4: ...the tank there is a high risk of accidents 1 4 Ser vicing and maintenance Regular maintenance as well as checking and servi cing of all system components guarantee its safe and economical operation in...

Page 5: ...EN DVGW VDI and VDE regulations of the local suppliers supply companies Note for the installation follow all effective national and international piping and installation rules same as rules for accide...

Page 6: ...tional magnesium anode prevents corrosion The boilers are equipped with a thermometer anode and a 50mm PU rigid foam insulation The insulation ensures that the boiler emits very little heat The AQA 30...

Page 7: ...ne off tap capacity This is the total quantity of hot water with 45 C which can be tapped from the hot water tank if the storage vessel is heated to 55 C below and is not reheated from the heater Hot...

Page 8: ...of Conformity EC Declaration of Conformity IDM Energiesysteme herewith declares that the hot water storage tanks described overleaf fulfill the provisions of the following relevant Community harmoniza...

Page 9: ...ter return flow R 1 IG 3 Forward flow heat pump R 1 IG 4 Return flow heat pump R 1 IG 5 Connection circulation R 3 4 IG 6 Sleeve for temperature sensor di 20mm 7 Sleeve for temperature sensor di 20mm...

Page 10: ...according to DIN 50930 6 The connec tion pipe work can be made with galvanised pipes stainless steel pipes copper pipes or plastic pipes The connections must be realised pressure tight The component...

Page 11: ...this 4 7 Water preparation In order to prevent damage through calcification on heat exchange surfaces the water must be treated in accordance with VDI Directive 2035 EN 12828 or NORM H5195 4 8 Magnesi...

Page 12: ...nes and instructions in the relevant assembly manual should be followed Symbol Bedeutung Heat emmitting system Low temperature heating Circulation pump M Three way mixer without bypass motor drive Thr...

Page 13: ...HC N_2 3 0 10 11 2 0 5 2 4 Note This schemes are only a tentative suggestion for installing an IDM heat pump in the heating system This suggestion replaces no professional planning of an executing com...

Page 14: ...33 B3 M73 M73 M73 B14 B14 B14 B41 AQA Direct heating circle OS HW CW RE A HC A TERRA IL Complete FS When using direct heating cirles and zone valves at least 25 of the zones have to be opened all the...

Page 15: ...ttle valve depth probe brine circuit HC module internal availabel as accessory Applications Overview Applications Overview 5 2 3 TERRA SW Complete HGL AQA TERMO 1 HC N_1 3 0 10 11 1 0 5 2 4 TERRA SW A...

Page 16: ...n our website www idm energie com IDM Academy PRACTICAL KNOWLEDGE FOR SALES AND TECHNOLOGY The comprehensive range of seminars for specialists at the IDM POWER FAMILY is available to you at all times...

Reviews: