- 13 -
2x
2x
2.
2.
1.
1.
2x
3x
3x
2x
1.
1.
2.
3.
3.
2.
6.
4.
4.
6.
5.
5.
B
A
•
Installation
•
Assemble the side
tables.
Remove the light beam.
(1. - 2.)
Screw on the side
tables and light
beam
(1. - 6.).
The machine is delivered ready for operation.
6 strong people are required to
lift the machine from the pallet.
Side tables, left and right, (
A)
are available as
accessories.
Attach the side tables to the front table so that
the upper surface is level.
(Screws and nuts are in a plastic bag in the
tool set (
B
).
Reassemble the safety light beam.
For transport through narrow doors:
•
Remove side tables
Danger!
The machine must not be put into
operation without the safety light beam.