ELECTRICAL WIRING
230V ~ 50Hz
KEY TO LAY-OUT
B5
– 2nd stage working signal
C
– Capacitor
CN1
– Ionisation probe
connector
E
– Electrode
h..
– Hour counter
MV
– Motor
PA
– Min. air pressure switch
PG
– Min. gas pressure svitch
RS
– Remote reset
SM
– Servomotor air damper
SO
– Ionisation probe
MG56
9
CONT
ROL
BOX
D4627
S3
– Lock-out signal
(230V - 0.5A max.)
T6A
– Fuse
TB
– Burner-earth
TL
– Limit thermostat
TR
– Adjustment
thermostat
TS
– Safety thermostat
V10
– Safety valve
V11
– 1
st
valve
V12
– 2
nd
valve
X..
– plug
XP..
– socket
ATTENTION:
Do not swap neutral and phase over, follow the diagram shown care-
fully and carry out a good earth connection.
The section of the conductors must be at least 1mm².
(Unless requested
otherwise by local standards and legislation).
The electrical wiring carried out by the installer must be in compliance
with the rules in force in the country
Connect the 2nd stage thermostat (
TR
) to terminals
T6
-
T8
and remove
the bridge.
TESTING
Check the burner has stopped by opening the thermostats.
Check that the burner is blocked by opening the connector (
CN1
) inserted
in the probe red wire and located outside the control box.
CONTROL BOX,
(see fig. 8)
To remove the control box from the burner it is necessary to:
disconnect all the connectors, the 7-pin plug, the high voltage cables and the
earth wire (
TB
);
unscrew the bolt (
A
, fig. 8) and pull the control box in the direction of the arrow.
To install the control box it is necessary to:
screw the bolt (
A
) in at a torque of 1 - 1.2 Nm;
reconnect all the connectors previously disconnected.
NOTES
The burners have been type-approved for intermittent operation. This means they
must stop at least once every 24 hours in order to allow the electrical control box
to check its efficiency on start-up. The boiler limit thermostat (
TL
) normally en-
sures the burner halts. If this does not happen a time switch halting the burner at
least once every 24 hours must be applied in series to limit thermostat (
TL
).
Main switch
Brown
Blue
Black
TO BE DONE BY
THE INSTALLER
CARRIED-OUT
IN THE FACTORY
A
Fig. 8
E9250