![IDEAL INDUSTRIES UniPRO MGig1 User Manual Download Page 31](http://html.mh-extra.com/html/ideal-industries/unipro-mgig1/unipro-mgig1_user-manual_617145031.webp)
UniPRO
152810
User Guide
Page 31
TRoute4 and TRoute6
Trace Route will display the route and measure transit delays of frames across an IP network.
Press the soft key SETUP (F4) to enter the target or select one from the IPv4 or v6 Target list, and to view
or amend the test settings.
Fig 39
Select an individual hop to view its
statistics.
The soft keys PREV (F1) and
NEXT (F3) and are used to
navigate between individual hops.
Each hop is traced three times.
The time recorded during each
trace is shown on the display in ms
as T1, T2 and T3.
PoE
When MGig1 is connected to a port it
automatically detects PoE voltage (when
present). In addition, running a PoE test
will apply a resistive load and measure the
power available at the connected port.
MGig1 identifies which pairs are carrying
power, and displays the voltage(V),
current(mA) and power(W). The PoE test
result screen at Fig 40 shows that pair one
and two, and pair three and six are carrying
11 Watts. The port tested is capable
of powering devices that require upto
11 Watts.
The test is PASSED because the power
available is ≥ the minimum power value
entered at set up.
Fig 40
Summary of Contents for UniPRO MGig1
Page 1: ...UniPRO MGig1 User Guide 152810 Iss 1 UniPRO SEL1 ...
Page 67: ......