1 BOILER DIMENsIONs, sERVICEs & CLEaRaNCEs
all dimensions in mm
The boiler connections are made on the boiler connection tails.
Refer to Frame 24.
The following minimum clearances must be maintained for
operation and servicing.
Additional space will be required for installation, depending upon
site conditions.
side and Rear Flue
a.
Provided that the flue hole is cut accurately, e.g. with a core
drill, the flue can be installed from inside the building where
wall thicknesses do not exceed 600mm (24”). Where the
space into which the boiler is going to be installed is less
than the length of flue required the flue must be fitted from
the outside.
*
Bottom clearance
Bottom clearance after installation can be reduced to 5mm.
This must be obtained with an easily removable panel, to enable
the consumer to view the system pressure gauge, and to provide
the 100mm clearance required for servicing.
Front clearance
The minimum front clearance when built in to a cupboard is 5mm
from the cupboard door but 450mm overall clearance is still
required, with the cupboard door open, to allow for servicing.
Rear Flue Only
Minimum top clearance required is 145mm.
395
278
76
830
Side flue
dim. A
2.5 from case
43
65
57
38 39
65
88
CH Flow
DHW Outlet
Gas Inlet
Condensate
DHW Inlet
CH Return
Connections
Front clearance
The minimum front clearance when built in to a cupboard is 5mm
from the cupboard door but 450mm overall clearance is still
required, with the cupboard door open, to allow for servicing.
*
Bottom clearance
Bottom clearance after installation can be reduced to 5mm.
This must be obtained with an easily removable panel, to
enable the consumer to view the system pressure gauge,
and to provide the 100mm clearance required for servicing.