background image

Assembly manual,use and maintenance 

Page 

 

 

 

 

I.C.S. INDUSTRIA COSTRUZIONI STAMPI SPA 

Via Maura Ponti (Prol. X Lodi)   

27010  Copiano  Pavia 

ASSEMBLY MANUAL, USE 

AND MAINTENANCE 

EDITION N° 1 OF  13.04.2015 

 

CONTAINER RECYCLING

 

 

           -     1     - 

 

        TECHNICAL DATA 

 

1

 

  GENERAL FEATURES 

The article, BIN CABINET WITH WHEELS FOR RECYCLING produced by ICS SPA factory in Copiano 

(Pavia), is a mobile container with plastic wheels, for the separate collection of materials recovered for 
recycling, and waste disposal . The different colors (RED, YELLOW, GREEN, BLUE, BROWN, GREY) 

help the differentiation of waste and proper disposal. Featuring Special rubbers cushioning on the lid, 

allowing it to absorb the impact of the closure reducing noise after disposal of the waste. (patented) for the 

rejection. (patented) Not only in sealing, the container is equipped with cushioning system of opening of 

the cover, to eliminate noise in the early stages of recovery of municipal, but also during the complete 

manual openings of the lid, avoiding that the same, slam violently against the body of the bin. (patented) 
Easy to use and can be moved as Strong wheels with solid rubber tires, secured by axle made of 

galvanized steel corrosion. The coupling seat, then the system of attachment of the wheels to the shaft 

galvanized, has been studied also to minimize the spaces between the wheels and the bin, avoiding that 

during transport of the bin, the rolling of the wheels cause excessive noise. 

1.1

 

        PART LIST 

The article, BIN WITH WHEELS FOR RECYCLING consists of the following components 

·

 

1  BIN BODY    •   2  LID WITH HANDLES 

·

 

3  PINS FIXING THE COVER OF THE BIN 

·

 

4  CUSHIONING OF RUBBER CLOSING THE LID  

·

 

5  CUSHIONING OF RUBBER OPENING THE LID 

·

 

6  GALVANIZED STEEL SHAFT, FOR ATTACHING THE WHEELS 

·

 

7  WHEELS 

 

Summary of Contents for LT 120

Page 1: ...STRIA COSTRUZIONI STAMPI S P A VIA MAURA PONTI PROL X LODI 27010 COPIANO PAVIA ITALIA EDITION OF del 13 04 2015 ASSEMBLY MANUAL USE AND MAINTENANCE USO E MANUTENZIONE BIN WITH WHEELS FOR RECYCLING LT...

Page 2: ...r assembly 2 2 Assembly instruction 3 CLEANING 3 1 Precautions Cleaning 4 ORDINARY MAINTENANCE 4 1 Accidental Event 4 2 Operation of extraordinary maintenance 5 PACKAGING AND DELIVERY BINS 5 1 Packagi...

Page 3: ...ook is primarily to provide the correct information on how to do the Assembly maintenance cleaning and shipping of BIN in full SAFETY Respecting conformity EU directives applicable to it 0 3 NORMATIVE...

Page 4: ...t only in sealing the container is equipped with cushioning system of opening of the cover to eliminate noise in the early stages of recovery of municipal but also during the complete manual openings...

Page 5: ...Y 1 POLIETILENE ALTA DENSITA STABILIZZATO UV 4 600 KG LID 1 POLIETILENE ALTA DENSITA STABILIZZATO UV 0 500KG PINS FIXING THE COVER OF THE BIN 2 POLIETILENE ALTA DENSITA STABILIZZATO UV 0 028 KG GALVAN...

Page 6: ...DENSITY UV STABILIZED 0 028 KG CUSCHIONING OF RUBBER CLOSING THE LID 4 RUBBER 0 005 KG CUSCHIONING OF RUBBER OPENING THE LID 2 RUBBER 0 005 KG GALVANIZED STEEL SHAFT FOR ATTACHING THE WHEELS 1 GAVANIZ...

Page 7: ...DENSITY UV STABILIZED 0 028 KG CUSCHIONING OF RUBBER CLOSING THE LID 4 RUBBER 0 005 KG CUSCHIONING OF RUBBER OPENING THE LID 2 RUBBER 0 005 KG GALVANIZED STEEL SHAFT FOR ATTACHING THE WHEELS 1 GAVANIZ...

Page 8: ...piano Pavia ASSEMBLY MANUAL USE AND MAINTENANCE EDITION N 2 OF 13 04 2015 CONTAINER RECYCLING 1 TECHNICAL DATA 1 3 DIMENSION BIN LT 80 RIF PICTURE DIM MODEL LT 80 Dim A mm 920 Dim B mm 860 Dim C mm 43...

Page 9: ...7010 Copiano Pavia ASSEMBLY MANUAL USE AND MAINTENANCE EDITION N 2 OF 13 04 2015 CONTAINER RECYCLING 1 TECHNICAL DATA BIN 120 RIF PICTURE DIM MODEL LT 120 Dim A mm 935 Dim B mm 875 Dim C mm 492 Dim D...

Page 10: ...10 Copiano Pavia ASSEMBLY MANUAL USE AND MAINTENANCE EDITION N 2 OF 13 04 2015 CONTAINER RECYCLING 1 TECHNICAL DATA BIN LT 240 RIF PICTURE DIM MODEL LT 240 Dim A mm 1063 Dim B mm 1000 Dim C mm 647 Dim...

Page 11: ...1 2 ASSEMBLY DIAGRAM I C S INDUSTRIA COSTRUZIONI STAMPI SPA Via Maura Ponti Prol X Lodi 27010 Copiano Pavia ASSEMBLY MANUAL USE AND MAINTENANCE EDITION N 2 OF 13 04 2015 CONTAINER RECYCLING 2 ASSEMBLY...

Page 12: ...n and state of preservation so that cracks or deformation affecting the perfect operation of the product In case you have abnormal contact your dealer FASI ASSEMBLY INSTRUCTION FOR THE BIN 1 Insert th...

Page 13: ...stance 3 1 PRECAUTIONS FOR CLEANING In case of use of industrial cleaners wear protective gloves and if the cleaner so requires wear a face mask especially for cleaning the inside of the bin preventin...

Page 14: ...anchor pin fixing lid to the bin and wheels to the axle 4 2 OPERATION OF EXTRAORDINARY MAINTENANCE In case of accidental release even partial is invited to reassemble if not damaged according to the a...

Page 15: ...ained files to be placed on pallets common measurement thus allowing to protect them in shipping and storage reducing the breakage of the covers during transport because they remain protected in the p...

Page 16: ...d that you respect certain parameters specified in the data sheet of the bin available from the Manufacturer With regard to shipping operations the only precaution is to check that the lids during loa...

Page 17: ...nd maintenance Page 17 I C S INDUSTRIA COSTRUZIONI STAMPI SPA Via Maura Ponti Prol X Lodi 27010 Copiano Pavia ASSEMBLY MANUAL USE AND MAINTENANCE EDITION N 1 OF 01 010 2010 CONTAINER RECYCLING 6 DECLA...

Page 18: ...Assembly manual use and maintenance Page 18...

Reviews: