Power Blower Data

TYPE:  

Positive Pressure Ventilator

BLADE:

Air Flex Fiberglass Reinforced Polyamide High Strength Blades, Die
Cast Aluminum  or Polypropylene.

BUSHING:

Keyed Shaft and Set or Cap Screws. 

SHROUD:

Turbo 2000 Tapered Aluminum.

DRIVE:

Industrial-Type, Straight-Banded V-Belt.

BEARINGS:

Locking, Self-Aligning and Permanently Lubricated. 

FRAME:

Rugged, Lightweight, Square-Steel Tubing  with Powder-Coat Finish.

GRILL:

Continuous Circular-Wound, External-Weld Steel Wire with 8 Tie
Points for Additional  Safety.

VIBRATION DAMPENERS:

Steel-Reinforced Rubber.

Electric Blowers: 

 All electric motors are single phase, 60 Hz, rigid base, 56 frame with ball and

bearings and manual reset overload protection.

ELECTRIC
UNITS 

ENGINE 

HP 

CFM 

S/B 

RPM 

WIDTH  DEPTH HEIGHT

LBS 

EBS-16

ELECTRIC

1/3 TEFC

3,200 

N.A. 

1,736 

18.75

14.25

19.50

47

EB-16-VSG

ELECTRIC

1.5 TEFC

0 - 11,125

7

3,150

19.25

19.25

21.25

83

Electric Blower Power Requirements*

Based on 115 v blower on a 20 amp circuit.

Blower
Model

Motor

HP

Starting

Amps

Starting

Watts

Running

Amps

Running

Watts

EBS-16

1/3 TEFC

10.9

6,300 

6.3

756

EB-16-VSG

1.5 TEFC

48

6,000

176

1,900

      *Starting amps and watts are momentary

Maximum Power Cord Length (in feet) **

Motor HP

14

Gauge

12

Gauge

10

Gauge

8

Gauge

6

Gauge

1/3

215'

   330'

550'

850'

1,350'

1.0

60'

95'

150'

240'

380'

** Calculations based on one blower connected to 20 amp circuit.

-4-

Summary of Contents for EBS-16

Page 1: ...lade and cutting surface ICS has since established ourselves as a leader and innovator in the air movement and dust control industry About This Manual This manual is produced solely for the use of pur...

Page 2: ...ic blower If such defects occur this warranty is void if service is attempted by non Authorized Service Depots Power Blower Data 4 Power Blower Electrical Information 5 OPERATION Operating Procedures...

Page 3: ...make sure the tank cap is closed properly and secured If any fuel is spilled make sure the area is dry before starting the engine 10 Never operate gasoline powered blowers in an enclosed or confined...

Page 4: ...ectric motors are single phase 60 Hz rigid base 56 frame with ball and bearings and manual reset overload protection ELECTRIC UNITS ENGINE HP CFM S B RPM WIDTH DEPTH HEIGHT LBS EBS 16 ELECTRIC 1 3 TEF...

Page 5: ...ntilation of the entire structure For additional information on how to accomplish PPV refer to PPV Set Up Procedures in this Manual Note The Industrial Power Blower is the most efficient tool for PPV...

Page 6: ...belt 1 Remove the eight bolts holding the front grill in place and remove the grill Figure 4 1 2 Loosen the four front engine mount bolts Figure 4 2 3 Use a lever to pry or push the engine downward to...

Page 7: ...into the adjoining threaded holes in the bushing Figure 4 6 Turn the screws in a clockwise manner Tighten the cap screws progressively with the wrench Evenly tighten each cap screw to a turn successiv...

Page 8: ...two bolts drawing the bushing and hub together 4 Slide the blade onto the bushing hub assembly and insert the three screws through the blade and turn evenly but do not tighten Make sure blade is in li...

Page 9: ...igure 5 1 If the blower is too close to the opening the opening will not be completely covered by pressurized air If the blower is too far from the opening pressurized air will strike the building aro...

Page 10: ...r combined ability to cover the larger opening with pressurized air The size of the opening dictates the numbers of blowers necessary to cover the opening with combined cones of pressurized air Rememb...

Page 11: ...s dependent on direction and velocity As in any ventilation operation maximum efficiency can be obtained by using the prevailing wind direction to advantage by pressurizing the structure on the windwa...