
iNS-308 User Manual
Copyright
©
2022 ICP DAS CO., Ltd. All Rights Reserved.
- 18 -
4.2
Schedule
On the Schedule page, you can manage the power schedule for PoE powered device(s) in a week.
The first section provides PoE Port select
、
schedule Enable/Disable and reset delay configure
interface.
Whan, Power On Schedule set to “Enable” and Power schedule setup is complete, must click “Update
Settings” button to seved and activation.
* Configure method please refer to
5.2 Power Schedule
chapter