7
2. Identify the Right Upright (74) and the Left
Upright (73).
See the inset drawing.
Tie the
lower end of the wire tie in the Right Upright se-
curely around the end of the Upright Wire
Harness (75). Have a second person hold the
Right Upright near the Right Base Cover (77).
Then, pull the other end of the wire tie up through
the rectangular hole in the bottom of the Right
Upright until the Upright Wire Harness is routed
completely through the Right Upright.
Gently pull up on the Upright Wire Harness (75)
as you set the Right Upright (74) on the Base
(83) inside the Right Base Cover (77).
Be care-
ful not to pinch the Upright Wire Harness.
Attach the Right Upright (74) to the Base (83)
with two Upright Bolts (72) and two Upright Star
Washers (90).
Do not tighten the Upright
Bolts yet.
Note: It may be necessary to tip the
tops of the Uprights forward slightly as you
thread the Upright Bolts into the Uprights.
Hold the Left Upright (73) near the Left Base
Cover (76). Pull the TV Cable (49) and the AV
Wire (97) up through the rectangular hole in the
bottom of the Left Upright and out of the top of
the Left Upright. Set the Left Upright on the
Base (83) inside the Left Base Cover. Attach the
Left Upright to the Base with two Upright Bolts
and two Upright Star Washers (not shown).
Do
not tighten the Upright Bolts yet.
With the help of a second person, lower the
treadmill off the cardboard stand.
83
76
75
Tie
77
2
74
73
49
97
90
72
3. Identify the Right Upright Sleeve (96) and the
Left Upright Sleeve (95); the Upright Sleeves
are labeled. Slide the Right Upright Sleeve onto
the Right Upright (74) and the Left Upright
Sleeve onto the Left Upright (73).
95
“Right”
“Left”
96
3
74
73
75
74
Wire
Tie