2
5
. Install the RXT shock using the factory lower bolt and a 17mm.
[FIGURE 3]
6.
Install stem bushings and hardware as shown in the diagram: Install the fi rst nut and fasten until there are enough exposed threads
available to secure the second jam nut. Install jam nut until it is fl ush with the top of the stem (DO NOT OVERTIGHTEN) and torque to
50 ft-lbs while holding the lower nut with a 19mm wrench. Do not overtighten bushing assembly, as this can lead to shock stem failure.
Failure caused by incorrect installation of stem bushings and hardware is NOT covered under ICON’s warranty policy.
7
. Mount the reservoir bracket to the reservoir using the supplied hose clamps and a 5/16”.
8
. Hold the reservoir against the frame and mark the hole location of the mounting hole from the reservoir bracket.
[FIGURE 4]
9
. Remove the reservoir bracket from the reservoir.
FIG.3
FIG.4