Installation
10
2
Installation
PRODUCT RECEIPT
The boilers are provided already covered with embossed aluminium with protective heat-shrink film.
–
The document envelope (1) contains:
-
adhesive nameplate
-
instruction manual
-
construction certificate and warranty
Inside the combustion chamber there is the turbulator unit to be inserted in the fire tubes during boiler installation.
1
m
IMPORTANT
The instruction manual is an integral part of the appliance and it MUST be carefully read before installing and
commissioning the boiler, carefully stored for further consultations and it MUST always accompany the boiler.
m
IMPORTANT
The control panel must be ordered separately from the boiler and is supplied in a separate package.
m
IMPORTANT
PACKAGING:
as for the package,
ICI CALDAIE S.p.A.
complies with the specific recycling systems of each country,
ensuring an optimal reuse of them. All the materials used for the packaging respect the environment and can be
recycled, such as wood, plastic, cardboard.