PRELIMINARY CHECKS
m
IMPORTANT
–
Before start-up, open the door and insert the turbulators completely inside the front ends of the smoke pipes, taking
care to push them inside by at least 100 mm.
–
Check that all fittings are fully tightened.
–
Check that all the safety and regulation accessories are correctly installed.
–
Safety devices (safety valves, safety pressure switch, safety thermostat) can be supplied already calibrated and sealed
during the manufacturing stage or otherwise they must be calibrated and sealed by the manufacturer and/or designated
Certification Body at the customer’s premises.
–
Regulation devices must be calibrated by the user based on the needs.
–
Make sure that the water delivery pipes are clean, by repeatedly flushing and draining them in the sewer before the final
filling.
–
Check the quality of the system water according to the indications in paragraph “CHARACTERISTICS OF WATER” of this manual.
–
Check the sealing and correct operation of all fitted components and accessories (pipes, valves, regulators, etc.).
–
Close the drain valves.
–
Open the flow and return shut-off valves.
–
Make sure that the water supply system pressure is correct.
–
Check the fuel system pressure and open the shut-off valves.
–
Make sure that the front door and the smokebox are correctly closed, checking for any leaks and, if necessary, progressively
tightening the fixing tie-rods.