(ICSF)
callable
services
designated
for
execution
on
the
CPACF
or
by
issuing
any
one
of
five
problem
state
instructions
(KMAC,
KM,
KMC,
KIMD,
KLMD)
documented
in
the
z/OS
Principals
of
Operation
.
Crypto
Express2
Crypto
Express2
is
an
optional
feature
that
combines
and
replaces
the
functionality
provided
by
PCI
Crypto
Accelerator
(PCICA)
and
the
PCI
X
Crypto
Coprocessor
(PCIXCC).
Crypto
Express2
is
immediately
available
for
use
if
the
LPAR
has
been
activated
with
the
Cryptographic
number
assigned
to
it
and
the
image
has
been
placed
in
the
Cryptographic
Online
List.
On
the
z9
EC,
the
maximum
number
of
Crypto
Express2
features
(0863)
is
eight
(8),
(The
z9
BC
can
have
a
combination
of
Crypto
Express2
and
Crypto
Express2-1P,
but
the
max
of
both
would
be
8.)
There
is
no
CHPID
association
to
Crypto
Express2
in
the
System
z9.
However,
a
Cryptographic
number
is
required
to
be
associated
with
each
Crypto
Express2
feature.
Crypto
Express2
is
associated
with
a
Cryptographic
number
during
its
installation.
This
Cryptographic
number
is
to
be
specified
in
the
Cryptographic
Candidate
and
Online
Lists.
(See
Trusted
Facility
Library
Use
the
manuals
listed
in
this
section
as
needed
for
background
or
supplemental
information.
Check
the
edition
notices
in
the
beginning
of
each
manual
for
correspondence
to
the
appropriate
driver
level.
For
manuals
that
do
not
specify
driver
level,
the
highest
(most
recent)
suffix
(last
two
digits
of
the
form
number)
is
required.
Table
B-1.
Trusted
Facility
Library
for
PR/SM
Title
Order
Number
System
z9
Enterprise
Class
System
Overview
SA22-6833
System
z9
Business
Class
System
Overview
SA22-1083
Hardware
Management
Console
Operations
Guide
SC28-6859
Support
Element
Operations
Guide
SC28-6860
Service
Guide
for
Hardware
Management
Consoles
and
Support
Elements
GC28-6861
Service
Guide
for
Trusted
Key
Entry
Workstations
GC28-6862
System
z9
Enterprise
Class
Service
Guide
GC28-6841
System
z9
Business
Class
Service
Guide
GC28-6853
System
z9
Enterprise
Class
Installation
Manual
GC28-6840
System
z9
Business
Class
Installation
Manual
GC28-6852
System
z9
Enterprise
Class
Installation
Manual
for
Physical
Planning
(IMPP)
GC28-6844
System
z9
Business
Class
Installation
Manual
for
Physical
Planning
(IMPP)
GC28-6855
Stand-alone
IOCP
User’s
Guide
SB10-7152
Input/Output
Configuration
Program
User’s
Guide
SB10-7037
z/OS
Hardware
Configuration
Definition:
User’s
Guide
SC33-7988
System
z9
Business
Class
Safety
Inspection
GC28-6854
B-14
PR/SM
Planning
Guide
Summary of Contents for Z9
Page 1: ...System z9 Processor Resource Systems Manager Planning Guide SB10 7041 03...
Page 2: ......
Page 3: ...System z9 Processor Resource Systems Manager Planning Guide SB10 7041 03...
Page 12: ...x PR SM Planning Guide...
Page 18: ...xvi PR SM Planning Guide...
Page 26: ...xxiv PR SM Planning Guide...
Page 54: ...1 28 PR SM Planning Guide...
Page 126: ...2 72 PR SM Planning Guide...
Page 220: ...4 8 PR SM Planning Guide...
Page 232: ...5 12 PR SM Planning Guide...
Page 250: ...B 16 PR SM Planning Guide...
Page 266: ...D 10 PR SM Planning Guide...
Page 272: ...X 6 PR SM Planning Guide...
Page 273: ......
Page 274: ...Printed in USA SB10 7041 03...