its
specific
logical
partition.
There
are
no
circumstances
where
a
logical
CP
can
be
″
transferred
″
to
another
logical
partition,
nor
is
there
a
capability
within
the
system
to
accomplish
this.
When
a
logical
CP
is
taken
offline,
the
data
structure
that
represents
it
is
marked
as
″
offline
″
,
and
continues
to
be
maintained
in
PR/SM-accessible
storage,
remaining
absolutely
bound
to
its
logical
partition
for
the
duration
of
that
partition’s
activation.
An
offline
logical
CP
presents
a
checkstopped
status
when
interrogated
by
the
other
logical
CPs
in
the
partition.
An
offline
logical
CP
can
be
restored
to
the
online
status
by
issuing
an
MVS
CONFIG
command.
MVS
uses
the
service
call
instruction
to
request
PR/SM
bring
an
offline
logical
CP
back
on
line.
If
successful,
MVS
prepares
its
control
structures
to
add
the
CP
to
its
pool
of
available
resources.
Initial
Program
Load
An
Initial
Program
Load
(IPL)
resets
a
logical
partition
to
prepare
it
for
loading
an
operating
system,
and
then
loads
the
operating
system
using
the
specified
IPL
address
and
IPL
parameter.
The
IPL
address
and
IPL
parameter
are
normally
entered
manually
in
the
image
activation
profile
or
the
load
profile.
However,
a
partition
with
I/O
Configuration
authority
has
the
capability
of
dynamically
changing
an
IPL
address
and
IPL
parameter.
This
could
potentially
cause
an
unintended
operating
system
to
be
loaded
into
the
partition.
To
prevent
this,
the
’Use
dynamically
changed
address’
and
’Use
dynamically
changed
parameter’
checkboxes
must
not
be
selected
in
the
activation
or
load
profile.
Cryptographic
Usage
and
Control
Domains
Trusted
Key
Entry
(TKE)
is
a
workstation
application
supported
by
ICSF
to
allow
an
alternative
method
of
securely
loading
cryptographic
keys
(DES
and
PKA
master
keys
and
operational
keys).
A
unique
set
of
cryptographic
keys
is
maintained
for
each
domain
index
within
the
cryptographic
facility.
Only
one
partition
can
perform
TKE
Workstation
functions
at
a
time.
The
partition
with
this
control
is
referred
to
as
the
TKE
host.
The
other
partitions
that
receive
key
updates
from
the
TKE
host
are
referred
to
as
the
TKE
targets.
TKE
host
and
target
partitions
are
defined
with
control
and
usage
domain
indexes.
The
usage
domain
is
the
area
a
logical
partition
will
use
for
actual
cryptographic
functions.
Usage
domains
are
unique
for
logical
partitions
within
a
single
System
z9.
The
TKE
host
partition’s
control
domain
index
list
must
include
the
usage
domain
index
for
all
the
TKE
target
partitions
for
which
it
has
control.
This
TKE
control
allows
one
logical
partition
to
set-up
the
domains
for
usage
by
other
logical
partitions.
Domains
specified
at
activation
remain
fixed
for
the
duration
of
the
activation.
Refer
to
z/OS
ICSF
Trusted
Key
Entry
PCIX
Workstation
User’s
Guide
,
in
addition
to
this
appendix,
for
further
detail
setting
up
partitions
for
TKE.
CP
Assist
for
Cryptographic
Functions
The
CPACF
is
a
cryptographic
feature
for
the
fast
processing
of
symmetric
clear
key
functions
(DES,
TDES,
AES)
and
hashes
(SHA-1,
SHA-256).
Each
PU
has
a
CPACF
attached
to
it.
To
use
CPACF
with
logical
partitions,
image
profiles
do
not
need
to
be
changed.
The
CPACF
will
require
enablement
via
the
loading
of
configuration
data
(FC
3863)
using
the
Support
Element
or
Single-Object
operations
on
the
Hardware
Management
Console.
If
CPACF
crypto
work
runs
on
any
image
on
a
machine,
that
workload
can
be
moved
to
another
image,
without
requiring
a
change
to
the
image,
or
an
outage
to
the
LPAR.
Access
to
the
CPACF
by
applications
can
be
made
using
either
the
Integrated
Cryptographic
Services
Facility
Appendix
B.
Developing,
Building,
and
Delivering
a
Certified
System
B-13
Summary of Contents for Z9
Page 1: ...System z9 Processor Resource Systems Manager Planning Guide SB10 7041 03...
Page 2: ......
Page 3: ...System z9 Processor Resource Systems Manager Planning Guide SB10 7041 03...
Page 12: ...x PR SM Planning Guide...
Page 18: ...xvi PR SM Planning Guide...
Page 26: ...xxiv PR SM Planning Guide...
Page 54: ...1 28 PR SM Planning Guide...
Page 126: ...2 72 PR SM Planning Guide...
Page 220: ...4 8 PR SM Planning Guide...
Page 232: ...5 12 PR SM Planning Guide...
Page 250: ...B 16 PR SM Planning Guide...
Page 266: ...D 10 PR SM Planning Guide...
Page 272: ...X 6 PR SM Planning Guide...
Page 273: ......
Page 274: ...Printed in USA SB10 7041 03...