13.
Push
the
latch
lock
2
away
from
the
rail
to
release
the
carrier.
The
latch-lock
carrier
slides
toward
the
front
of
the
rack,
and
the
locating
pins
project
through
the
holes
that
are
in
the
front
flange
and
in
the
front
rail
bracket.
Important:
Ensure
that
the
locating
pins
are
fully
extended
through
the
front
rail
bracket.
14.
Push
the
back
rail
bracket
1
(see
toward
the
rear
of
the
rack
and
align
the
locating
pins
with
the
rack-mounting
flange.
15.
Push
the
latch
lock
2
(see
away
from
the
rail
to
release
the
carrier.
The
latch-lock
carrier
slides
toward
the
rear
of
the
rack,
and
the
locating
pins
project
through
the
holes
that
are
in
the
rear
flange
and
in
the
rear
rail
bracket.
Important:
Ensure
that
the
locating
pins
are
fully
extended
through
the
rear
rail
bracket.
16.
On
the
rear
of
each
rail
press
the
blue
release
tab
and
slide
the
shipping
bracket
off
the
slide
rail.
Store
the
shipping
bracket
for
further
use.
Installing
the
SAN
Volume
Controller
into
the
rack
This
task
includes
the
steps
you
must
complete
to
install
the
SAN
Volume
Controller
into
the
rack.
Prerequisites:
Before
you
install
the
SAN
Volume
Controller
into
the
rack;
review
the
following
caution
notice.
1
2
Figure
31.
Closing
the
latch-lock
carrier
assembly
Chapter
4.
Installing
the
uninterruptible
power
supply,
the
master
console,
and
the
SAN
Volume
Controller
29
Summary of Contents for TotalStorage
Page 1: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 2: ......
Page 3: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 22: ...xx Installation Guide...
Page 36: ...14 Installation Guide...
Page 58: ...36 Installation Guide...
Page 74: ...52 Installation Guide...
Page 80: ...58 Installation Guide...
Page 84: ...62 Installation Guide...
Page 89: ......
Page 90: ...Part Number 64P8120 Printed in USA SC26 7541 02 1P P N 64P8120...
Page 91: ...Spine information IBM TotalStorage SAN Volume Controller Installation Guide Version 1 2 0...