background image

IBM TotalStorage NAS 200
Model 25T

Quick Start Instructions

Summary of Contents for TotalStorage NAS 200 25T

Page 1: ...IBM TotalStorage NAS 200 Model 25T Quick Start Instructions...

Page 2: ...October 2002 Copyright International Business Machines Corporation 2002 All rights reserved US Government Users Restricted Rights Use duplication or disclosure restricted by GSA ADP Schedule Contract...

Page 3: ...devices Notes 1 Make sure the rack is stabilized before installing hardware and always load it starting at the bottom and moving upward to the top 2 Visually inspect the unit to ensure that it was no...

Page 4: ...clip nuts screw packages and slide rails and Rack Mounting Instructions Items you provide v One Phillips 2 screwdriver v One flat blade screwdriver v One One Ethernet cable Cat5 copper cable if you a...

Page 5: ...ck configuration only Mark the rack configuration location on the rack by placing the provided stickers over the holes on the front and rear of the rack indicated by the arrows on the template 2 Inser...

Page 6: ...lide rails to the rack using the M6 screws provided 4 Attach the hinge bracket to the rear of the rack using the M6 screws provided Then attach the cable management assembly to the slide rail by slidi...

Page 7: ...engine onto the slide rails ensuring that the bracket notches on the front of the engine fit securely on the tabs located on the front of the slide rails 6 Secure the appliance to the rails using the...

Page 8: ...to your network Connect each power cable to the receptacles on the back of the engine and then to different power source outlets 2 Route the power and network cables through the cable restraint bracke...

Page 9: ...rack and plugging the network cables to the Ethernet ports and then into your network Connect each power cable to the receptacles on the back of the engine and then to different power source outlets...

Page 10: ...ngine into the rack until the release latches snap shut Then insert the M6 screws provided through the release latch bracket assembly on either side of the engine Note Inserting the M6 screws is requi...

Page 11: ...l to map out the initial configuration tasks and lead you through the tasks in the correct order The tool detects which NAS appliance it is running on and adjusts the menu and content appropriately Yo...

Page 12: ...following tools v ServeRAID manager to create arrays and logical drives v Disk Management to write signatures create partitions and assign drive letters 4 Complete storage access setup For detailed i...

Page 13: ...erveRAID TotalStorage Microsoft Windows and Windows NT are trademarks or registered trademarks of Microsoft Corporation Java and all Java based trademarks and logos are trademarks or registered tradem...

Page 14: ...12 NAS 200 Model 25T Quick Start Instructions...

Page 15: ......

Page 16: ...Printed in U S A...

Reviews: