a.
Partially insert the large air duct housing into the frame by sliding it along
the side rails.
b.
Insert long screws into the holes located near the bottom of each side of the
air duct housing.
c.
Slide the plastic spacers over the backs of the screws.
d.
Slowly slide the air duct housing into the frame, taking care to align the
screws with the holes in the frame.
e.
Tighten the screws to secure the air duct housing to the frame.
4.
Install the Ethernet switches into the air duct housing. To do so, working from
the back side of the frame:
a.
Carefully slide one of the Ethernet switches into the air duct housing at
position 3 on the frame, with the Ethernet ports facing outward.
b.
Aligning the top hole in the mounting bracket on the Ethernet switch with
the guide pins on the rails.
c.
Insert a short flanged screw into the bottom holes on each side of the
mounting bracket, and tighten the screws to secure the Ethernet switch to
the rails.
d.
Repeat the steps above for the other Ethernet switch.
5.
When installation of the 1 Gb Ethernet switches is complete, go to “Cabling a
clustered gateway” on page 49.
Applying cable labels
Apply cable labels to the power, Ethernet and fibre channel cables.
About this task
Use the IBM System Storage TS7600 with ProtecTIER Labeling Instructions for the
TS7650/TS7650G (3958 DD4 and 3958 AP1), IBM part number 46X6059 for label
placement guidelines and instructions. When applying labels, align the center
reference lines on the label with the axis of the cable.
Cabling a stand-alone gateway
This procedure provides steps for cabling the components included in the purchase
of the TS7650G stand-alone gateway to each other, as well as to the power
distribution units (PDUs), the recommended disk controllers, and the customer
network.
About this task
For other supported components, review this information for general guidelines,
then refer to the manufacturers' documentation for details. More information, see
the IBM System Storage TS7650 Best Practices Guide for ProtecTIER v 2.5 and TS7650G
(Gateway) Attached Storage, IBM form number GA32-0646.
Tip:
For simplicity and ease of use, the instructions for each type of cable
connection (power, Ethernet, and fibre channel) start on a new page.
Notes:
v
Cat 5e or higher cable is required for all Ethernet connections.
v
Route all cables through the cable management arms and secure with straps.
Chapter 4. Installing the TS7650G hardware
35
Summary of Contents for System Storage TS7650G 3958 DD4
Page 2: ......
Page 7: ...Russia Electromagnetic Interference EMI Class A Statement 189 Index 191 Contents v...
Page 8: ...vi IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 10: ...viii IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 12: ...x IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 16: ...xiv IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 30: ...xxviii IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 38: ...xxxvi IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 44: ...6 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 46: ...8 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 54: ...16 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 89: ...Figure 20 Clustered TS7650G power cabling Chapter 4 Installing the TS7650G hardware 51...
Page 120: ...82 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 148: ...110 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 150: ...112 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 156: ...118 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 172: ...134 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 192: ...154 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 198: ...160 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 210: ...172 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 220: ...182 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 228: ...190 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 231: ......
Page 232: ...Part Number 46X6052 Printed in USA or Mexico GC53 1154 09 1P P N 46X6052...