![IBM Storwize V5000 Gen2 Quick Installation Manual Download Page 64](http://html1.mh-extra.com/html/ibm/storwize-v5000-gen2/storwize-v5000-gen2_quick-installation-manual_4058016064.webp)
2
Power cable retention clamps
3
Fan module
4
Fan release latch
5
Fan fault indicator
6
Expansion canister
7
SAS ports and indicators
8
Expansion canister indicators
9
Power cable connector for PSU 1
Support rails
Figure 25 on page 38 shows the support rails for the expansion enclosure. The support rails are
packaged separately from the expansion enclosure.
Figure 25. 2077-92F support rails
Cable management arm
The cable management arm (CMA), which consists of an upper and lower assembly, are packaged
separately from the expansion enclosure. As Figure 26 on page 39 shows, each CMA assembly is
attached to the rear end of the support rails.
38 Storwize V5000 Gen2: Quick Installation Guide
Summary of Contents for Storwize V5000 Gen2
Page 1: ...IBM Storwize V5000 Gen2 Quick Installation Guide IBM...
Page 5: ...Index 149 v...
Page 6: ...vi...
Page 156: ...130 Storwize V5000 Gen2 Quick Installation Guide...
Page 164: ...138 Storwize V5000 Gen2 Quick Installation Guide...
Page 166: ...140 Storwize V5000 Gen2 Quick Installation Guide...
Page 168: ...142 Storwize V5000 Gen2 Quick Installation Guide...
Page 177: ......
Page 178: ...IBM...