Setting the switch password

1. Click

on the EZManager

screen. The

screen is

displayed.

2. Create a new administrator account password in the

screen.

3. Enter a new name for the switch (optional step).

4. Adjust the date and time for your time zone (optional step).

5. Click

.

Next

Welcome to Switch Configuration

Set Parameters

Set Parameters

Next

Configuring the zones and selecting devices

1. Select

on the

screen and then click

.

Typical Zoning is the default zone configuration.

2. Enter the number and types of devices that you are connecting to the switch in the

screen.

EZSwitchSetup uses these values to automatically configure the ports on your switch.

Typical Zoning

Select Zoning

Next

Device Selection

Connecting devices

The

screen displays a graphical representation of the switch with the

device connections based on the information that you entered when you configured zones and performed
device selection. The screen shows the connections as missing until you connect the devices that you
specified.

Configure Ports and Connect Devices

1. Install the SFP transceivers in the Fibre Channel ports on the switch to match the ports shown on the

screen.

a. Remove any protector plugs from the SFP transceivers

you are going to use.

b. Position and insert each SFP transceiver until it is

firmly seated.

c. Close the latching bale (if any). Repeat for the other

ports.

2. Make the physical connections to your host and storage devices. Match the physical connections to the

connections shown on the

screen.

Configure Ports and Connect Devices

a. Remove plastic protector caps from the cable ends (if any),

and position the cable connector so that it is oriented correctly.

b. Insert the cable connector into the SFP until it is firmly seated

and the latching mechanism clicks.

c. The

screen shows

missing, valid, and invalid connections as you cable the switch.
Note that it can take up to 15 seconds for the connection to
display as a valid connection. Verify that the connections all
display green and then click

.

Configure Ports and Connect Devices

Next

3. The

screen will display this message: “Congratulations—you’ve successfully completed the setup!”

4. Click

to exit setup. If you used the serial connection for setup, you can remove the serial cable.

Additional configuration options, such as custom zoning, are available from EZManager. See the

for more information on custom zoning, and other switch configuration and management

options.

Finish

Finish

EZSwitchSetup

Administrator’s Guide

© Copyright International Business Machines Corporation 2009. All rights reserved. US Government Users Restricted Rights – Use,
duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp.
© 2009 Brocade Communications Systems, Inc. All Rights Reserved.

Printed in USA

GC27-2271-00

45W6292

IBM, the IBM logo, and ibm.com are trademarks or registered trademarks of International Business Machines Corporation in the
United States, other countries, or both. A complete and current list of other IBM trademarks is available on the Web at
www.ibm.com/legal/

Setting the switch IP address

1. Enter the required information in the

screen.

2. If prompted to install Active X or a version of the Java runtime environment, do so. Reboot the setup

computer, if required.

3. Click

. The

screen is displayed.

4 Click

to confirm the addresses. The

screen is displayed.

5. Click

.

SetSwitch IP Address

Next

Confirm IP Address

Next

Continue Configuration

Continue with EZManager