1
Assembly wing nuts
2
Wing nut
5.
Select the holes in the rail where you want to position the 2145 UPS-1U.
Note:
The bottom flange of the support rail must align with the EIA mark on the rack.
6.
Using two M6
×
10 screws (
1
in Figure 327) and two clip nuts
2
, attach the rail to the rear of the
rack. The customer's rack might be different than the one shown here, and if so, might require
different clip nuts or fasteners.
7.
Install two clip nuts (
2
and
3
in Figure 328 on page 317) to the front of the rack, then attach the
rail using just one M6 x 10 screw in the bottom mounting hole
1
.
Front
Rear
svc00033
2
1
Figure 326. Adjusting the rail depth on the 2145 UPS-1U
1
2
svc00034
Figure 327. Securing the rear rail on the 2145 UPS-1U
316
IBM SAN Volume Controller Hardware Maintenance Guide
Summary of Contents for SAN Volume Controller 2145-CG8
Page 1: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 2 0 GC27 2283 00...
Page 2: ......
Page 3: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 2 0 GC27 2283 00...
Page 14: ...xii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 24: ...xxii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 30: ...xxviii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 54: ...24 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 362: ...332 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 364: ...334 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 371: ......
Page 372: ...Part Number 31P1584 Printed in USA GC27 2283 00 1P P N 31P1584...