3.
If necessary, remove the filler panels to allow access to the inside of the rack enclosure where you
plan to place the unit, as shown in Figure 1.
4.
Determine to place the system in the rack. Record the EIA location.
5.
Facing the front of the rack and working from the right side, use tape, a marker, or pencil to mark
the lower hole of each EIA unit.
6.
Repeat step 5 for the corresponding holes located on the left side of the rack.
7.
Go to the rear of the rack.
8.
On the right side, find the EIA unit that corresponds to the bottom EIA unit marked on the front of
the rack.
9.
Mark the bottom EIA unit.
10.
Mark the corresponding holes on the left side of the rack.
Attaching the rails to the system chassis and to the rack
You must install the rails onto the chassis and into the rack. Use this procedure to perform this task.
Figure 1. Removing the filler panels
Installing and configuring the system
3
Summary of Contents for Power Systems 8001-22C
Page 1: ...Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C IBM...
Page 2: ......
Page 3: ...Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C IBM...
Page 16: ...xiv Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C...
Page 136: ...120 Power Systems Installing the IBM Power System S822LC for Big Data 8001 22C...
Page 137: ......
Page 138: ...IBM Printed in USA...