![IBM Power Systems 7063-CR1 Service Manual Download Page 85](http://html1.mh-extra.com/html/ibm/power-systems-7063-cr1/power-systems-7063-cr1_service-manual_3330678085.webp)
Starting and stopping the 7063-CR1
Learn how to start and stop the IBM 7063-CR1 Hardware Management Console system to perform a
service action or system upgrade.
Starting the 7063-CR1 system
You can use the power button to start the IBM 7063-CR1 Hardware Management Console systems.
About this task
Attention:
For safety, airflow purposes and thermal performance, the service access cover must be
installed and fully seated before you power on the system.
You can use this procedure to power on the system; or you can use a console and the IPMI tool to power
on the system.
Procedure
1.
Before you press the power button, ensure that the power supplies are connected to the system unit
and that the power cables are connected to a power source.
2.
Press the power button (7) shown in Figure 66. You may have to press the switch for 0.5 to 3 seconds.
What to do next
If you press the power button and the system does not start, contact your next level of support or your
service provider.
Stopping the 7063-CR1 system
Learn how to stop the IBM 7063-CR1 Hardware Management Console systems to complete another task.
Figure 66. Power switch for 7063-CR1
Common procedures for servicing the 7063-CR1
69
Summary of Contents for Power Systems 7063-CR1
Page 1: ...Power Systems Servicing the 7063 CR1 Hardware Management Console system IBM ...
Page 2: ......
Page 3: ...Power Systems Servicing the 7063 CR1 Hardware Management Console system IBM ...
Page 16: ...xiv Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Page 76: ...60 Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Page 98: ...82 Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Page 110: ...94 Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Page 111: ......
Page 112: ...IBM Printed in USA ...