The Power-up Sequence
35
The Power-up
Sequence
The following sections describe how to get your Switch powered-up and
ready for operation.
Connecting a
Redundant Power
System
You can connect an Advanced Redundant Power System to the Switch.
This unit, which is also known as an RPS, is designed to maintain the
power to your Switch if a power supply failure occurs.
For normal redundancy, the unit requires one Type 2 Power Module.
Contact your supplier for details.
For full redundancy, the unit requires two Type 2 Power Modules
combined using a Type 2 Y-Cable. Contact your supplier for details.
ATTENTION:
The Switch can only use a recommended Advanced
Redundant Power System output. Contact your supplier for details.
Powering-up the
Switch
Use the following sequence of steps to power-up the Switch.
DANGER:
It is essential that the mains socket outlet is installed near to
the unit and is accessible. You can only disconnect the unit by removing
the appliance coupler from the unit.
1
Plug the power cord into the power socket at the rear of the Switch.
2
Plug the other end of the power cord into your power outlet
The Switch powers-up and runs through its Power On Self Test (POST),
which takes approximately 12 seconds.
Checking for Correct
Operation
During the Power On Self Test, all ports on the Switch are disabled and
the LEDs light in the following sequence:
■
All unit LEDs light
■
Module LEDs light
■
Port Status LEDs light in a rapid cycle
When the POST has completed, check the Power/Self Test LED to check
that your Switch is operating correctly. Table 2 shows possible colors for
the LED.
F24usr.bk Page 35 Thursday, January 14, 1999 10:41 AM
Summary of Contents for Nways 8271 F12
Page 6: ...vi F24usr bk Page vi Thursday January 14 1999 10 41 AM...
Page 10: ...10 SAFETY NOTICES F24usr bk Page 10 Thursday January 14 1999 10 41 AM...
Page 11: ...Safety Notices 11 F24usr bk Page 11 Thursday January 14 1999 10 41 AM...
Page 12: ...12 SAFETY NOTICES F24usr bk Page 12 Thursday January 14 1999 10 41 AM...
Page 16: ...16 ABOUT THIS GUIDE F24usr bk Page 16 Thursday January 14 1999 10 41 AM...
Page 28: ...28 CHAPTER 1 INTRODUCING THE SWITCH F24usr bk Page 28 Thursday January 14 1999 10 41 AM...
Page 43: ...Important Safety Information 43 F24usr bk Page 43 Thursday January 14 1999 10 41 AM...
Page 59: ...Important Safety Information 59 F24usr bk Page 59 Thursday January 14 1999 10 41 AM...
Page 60: ...60 APPENDIX A SAFETY INFORMATION F24usr bk Page 60 Thursday January 14 1999 10 41 AM...
Page 64: ...64 APPENDIX B PIN OUTS F24usr bk Page 64 Thursday January 14 1999 10 41 AM...
Page 86: ...86 GLOSSARY F24usr bk Page 86 Thursday January 14 1999 10 41 AM...