2
IBM Netfinity FAStT500 RAID Controller Enclosure Unit Installation Guide
The following figure shows the Netfinity FAStT500 RAID Controller Enclosure Unit.
Figure 1. Netfinity FAStT500 RAID Controller Enclosure Unit
The controller unit comes with the following items:
Hardware:
•
Two RAID controllers
•
Two power supplies
•
Battery
•
Two host mini-hubs and two drive mini-hubs
•
Two power cords or two high voltage rack jumpers
•
One rack-mounting hardware kit:
•
Two rails (right and left)
•
Eight black M6 hex-head screws
•
Eight clip nuts
•
Eight cage nuts
Summary of Contents for Netfinity FAStT500
Page 1: ......
Page 2: ......
Page 3: ...Netfinity FAStT500 RAID Controller Enclosure Unit Installation Guide ...
Page 7: ...v Index 63 ...
Page 8: ...vi IBM Netfinity FAStT500 RAID Controller Enclosure Unit Installation Guide ...
Page 38: ...22 IBM Netfinity FAStT500 RAID Controller Enclosure Unit Installation Guide ...
Page 56: ...40 IBM Netfinity FAStT500 RAID Controller Enclosure Unit Installation Guide ...
Page 83: ... Part Number 19K0788 Printed in U S A April 2000 19K0788 ...