Step
1542-5
There
are
missing
devices
associated
with
one
or
more
I/O
subsystems.
Note:
Before
continuing,
check
the
cabling
from
the
processor
subsystem
to
I/O
subsystem(s)
to
ensure
that
the
system
is
cabled
correctly.
Refer
to
for
valid
configurations.
Record
the
current
cabling
configuration
and
then
continue
with
the
following
steps:
1.
Turn
off
the
power.
2.
At
the
primary
I/O
book,
disconnect
the
cable
connection
at
RIO
port
A0
(U1.18-P1-H2/Q1).
3.
Disconnect
the
cable
connection
at
I/O
subsystem
1
left
I/O
port
connector
0
(U1.9-P1/Q2).
The
RIO
cable
that
was
connected
to
RIO
port
A0
should
now
be
loose
and
can
be
removed.
4.
At
the
primary
I/O
book,
disconnect
the
cable
connection
at
RIO
port
A1
(U1.18-P1-H2/Q2)
and
reconnect
it
to
RIO
port
A0
(U1.18-P1-H2/Q1).
5.
Disconnect
the
cable
connection
at
I/O
subsystem
1
right
I/O
port
connector
1
(U1.9-P2/Q1).
The
RIO
cable
that
was
connected
to
RIO
port
A0
on
the
primary
I/O
book
should
now
be
loose
and
can
be
removed.
6.
Verify
that
processor
subsystem
RIO
port
A0
on
primary
I/O
book
(U1.18-P1-H2/Q1)
is
connected
to
I/O
subsystem
1
left
I/O
port
connector
0
(U1.9-P1/Q2).
7.
Verify
that
I/O
subsystem
1
left
I/O
port
connector
1
(U1.9-P1/Q1)
is
connected
to
I/O
subsystem
1
right
I/O
port
connector
0
(U1.9-P2/Q2).
8.
Turn
on
the
power
to
boot
standalone
diagnostics
from
CD.
9.
If
the
Please
define
the
System
Console
screen
is
displayed,
follow
directions
to
select
the
system
console.
10.
Use
the
Display
Configuration
and
Resource
List
to
list
all
attached
devices
and
adapters
(refer
to
the
RS/6000
and
Eserver
pSeries
Diagnostic
Information
for
Multiple
Bus
Systems
if
necessary).
11.
Check
that
all
attached
devices
and
adapters
are
listed.
Did
the
Please
define
the
System
Console
screen
display
and
are
all
attached
devices
and
adapters
listed?
NO
Go
to
YES
The
RIO
cable
that
was
removed
in
step
above
is
defective.
Replace
the
RIO
cable.
Connect
the
new
RIO
cable
from
I/O
subsystem
1
right
I/O
port
connector
1
(U1.9-P2/Q1)
to
processor
subsystem
RIO
port
A1
on
primary
I/O
book
(U1.18-P1-H2/Q2).
Reconfigure
the
system
to
its
original
condition.
Go
to
“MAP
0410:
Repair
Checkout”
in
the
RS/6000
and
Eserver
pSeries
Diagnostic
Information
for
Multiple
Bus
Systems
.
Chapter
3.
Maintenance
Analysis
Procedures
323
Summary of Contents for eserver pSeries 690
Page 1: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Page 2: ......
Page 3: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Page 12: ...x Eserver pSeries 690 Service Guide...
Page 14: ...xii Eserver pSeries 690 Service Guide...
Page 228: ...Step 1527 5 Call your next level of support 212 Eserver pSeries 690 Service Guide...
Page 362: ...Step 1545 15 Call for support This ends the procedure 346 Eserver pSeries 690 Service Guide...
Page 381: ...Step 154A 14 Turn off the power Chapter 3 Maintenance Analysis Procedures 365...
Page 430: ...414 Eserver pSeries 690 Service Guide...
Page 798: ...782 Eserver pSeries 690 Service Guide...
Page 923: ...L3 Cache Shorts Test Step 4 Chapter 9 Removal and Replacement Procedures 907...
Page 924: ...L3 Cache Shorts Test Step 5 908 Eserver pSeries 690 Service Guide...
Page 926: ...L3 Cache Shorts Test Step 2 910 Eserver pSeries 690 Service Guide...
Page 928: ...L3 Cache Shorts Test Step 4 912 Eserver pSeries 690 Service Guide...
Page 929: ...L3 Cache Shorts Test Step 5 Chapter 9 Removal and Replacement Procedures 913...
Page 1055: ...7040 Model 681 Media Subsystem 1 2 3 4 5 6 7 8 9 10 Chapter 10 Parts Information 1039...
Page 1057: ...Power and SCSI Cables to the Media Subsystem 1 2 3 5 4 6 Chapter 10 Parts Information 1041...
Page 1061: ...Power Cabling Chapter 10 Parts Information 1045...
Page 1090: ...1074 Eserver pSeries 690 Service Guide...
Page 1094: ...1078 Eserver pSeries 690 Service Guide...
Page 1122: ...1106 Eserver pSeries 690 Service Guide...
Page 1124: ...1108 Eserver pSeries 690 Service Guide...
Page 1132: ...1116 Eserver pSeries 690 Service Guide...
Page 1133: ......
Page 1134: ...Printed in U S A February 2004 SA38 0589 05...