background image

v

While the device is still in its static-protective package, touch it to any

unpainted

metal surface of the BladeCenter unit or any

unpainted

metal surface on any

other grounded component in the rack you are installing the device in for at
least 2 seconds. (This drains static electricity from the package and from your
body.)

v

Remove the device from its package and install it directly into the blade server
without setting down the device. If it is necessary to set down the device, put it
back into its static-protective package. Do not put the device on the blade server
cover or on a metal surface.

v

Take additional care when you handle devices during cold weather. Heating
reduces indoor humidity and increases static electricity.

Installing the expansion card

Figure 1 on page 9 shows installation of the expansion card in a typical blade
server system board; the procedure for installing the card in an expansion unit is
similar. The appearance of your blade server or expansion unit might be different.
See the documentation that came with your blade server or expansion unit for
more information.

To install the expansion card, complete the following steps:

1.

Read the safety information that begins on page v and the guidelines in
“Handling static-sensitive devices” on page 7.

2.

If the blade server is installed in the BladeCenter unit, remove it (see the
documentation that came with your BladeCenter unit for instructions).

3.

Carefully lay the blade server on a flat, static-protective surface.

4.

Open the blade server cover or expansion-unit cover (see the documentation
that came with your BladeCenter unit for instructions).

5.

Touch the static-protective package that contains the expansion card to any

unpainted

metal surface on the BladeCenter

®

unit or any

unpainted

metal

surface on any other grounded rack component; then, remove the expansion
card from the package.

6.

Check the blade expansion connector on both the expansion card and the
blade server for gray protective covers, and if present, remove them.

7.

Hold the expansion card at an approximate 30° angle and slide the card into
mounting post until the card-guide holes are aligned with the locator pins on
the mounting posts. When the holes are properly aligned over the pins, the
card will pivot down slightly.

8.

Press down firmly on the “Press to Install” label on the expansion card until
the connector on the expansion card is fully seated into the connector on the
blade server.

8

Intel 10Gb 2-port Ethernet Expansion Card (CFFh): Installation Guide

Summary of Contents for CFFh

Page 1: ...Intel 10Gb 2 port Ethernet Expansion Card CFFh for IBM BladeCenter Installation Guide ...

Page 2: ......

Page 3: ...Intel 10Gb 2 port Ethernet Expansion Card CFFh for IBM BladeCenter Installation Guide ...

Page 4: ...ation document and the IBM Safety Information and IBM Systems Environmental Notices and User Guide documents on the IBM Documentation CD First Edition February 2010 Copyright International Business Machines Corporation 2010 US Government Users Restricted Rights Use duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp ...

Page 5: ...pendix B Notices 15 Trademarks 15 Important notes 16 Electronic emission notices 17 Federal Communications Commission FCC statement 17 Industry Canada Class A emission compliance statement 17 Avis de conformité à la réglementation d Industrie Canada 17 Australia and New Zealand Class A statement 17 United Kingdom telecommunications safety requirement 17 European Union EMC Directive conformance sta...

Page 6: ...iv Intel 10Gb 2 port Ethernet Expansion Card CFFh Installation Guide ...

Page 7: ...än tuotteen lue turvaohjeet kohdasta Safety Information Avant d installer ce produit lisez les consignes de sécurité Vor der Installation dieses Produkts die Sicherheitshinweise lesen Prima di installare questo prodotto leggere le Informazioni sulla Sicurezza Les sikkerhetsinformasjonen Safety Information før du installerer dette produktet Antes de instalar este produto leia as Informações sobre S...

Page 8: ...caution statement is labeled Statement 1 translations for that caution statement are in the Safety Information document under Statement 1 Be sure to read all caution and danger statements in this document before you perform the procedures Read any additional safety information that comes with the server or optional device before you install the device This device is intended for use with UL Listed...

Page 9: ...equipment when there is evidence of fire water or structural damage v Disconnect the attached power cords telecommunications systems networks and modems before you open the device covers unless instructed otherwise in the installation and configuration procedures v Connect and disconnect cables as described in the following table when installing moving or opening covers on this product or attached...

Page 10: ...zardous energy is present when the blade server is connected to the power source Always replace the blade server cover before installing the blade server viii Intel 10Gb 2 port Ethernet Expansion Card CFFh Installation Guide ...

Page 11: ... on the IBM Documentation CD See http www ibm com servers eserver serverproven compat us for a list of I O modules that are compatible with the expansion card You can obtain additional information about the expansion card and other IBM BladeCenter products at http www ibm com systems support If you participate in the IBM client reference program you can share information about your use of technolo...

Page 12: ...Mware Option package contents The expansion card option package contains the following items v An Intel 10Gb 2 port Ethernet Expansion Card CFFh for IBM BladeCenter v Important Notices document v Warrany Information document v Intel 10Gb 2 port Ethernet Expansion Card CFFh for IBM BladeCenter Documentation CD Related documentation The following documentation is provided on the IBM Documentation CD...

Page 13: ...Center units v IBM BladeCenter Interoperability Guide This document provides instructions to install the blade server in the interconnect module For the latest version of this document go to http www ibm com systems support and search for BladeCenter Interoperability Guide To check for updated documentation and technical updates complete the following steps Note Changes are made periodically to th...

Page 14: ...ou are using a Windows operating system insert the CD into the CD or DVD drive and click Start Run In the Open field type e win32 bat where e is the drive letter of the CD or DVD drive and click OK If you are using a Linux operating system insert the CD into the CD or DVD drive then run the following command from the mnt cdrom directory sh runlinux sh Select the expansion card from the Product men...

Page 15: ...notices provide information or advice that might help you avoid inconvenient or problem situations v Attention These notices indicate possible damage to programs devices or data An attention notice is placed just before the instruction or situation in which damage might occur v Caution These statements indicate situations that can be potentially hazardous to you A caution statement is placed just ...

Page 16: ...6 Intel 10Gb 2 port Ethernet Expansion Card CFFh Installation Guide ...

Page 17: ...es Media Access Control addresses Media Access Control MAC addresses have been assigned and installed on the expansion card Each port has a MAC address These two base MAC addresses MAC 1 and MAC 2 are part of the expansion card vital product data VPD The BladeCenter Open Fabric Manager BOFM application can update the two MAC addresses for a specific blade server location Handling static sensitive ...

Page 18: ...ng steps 1 Read the safety information that begins on page v and the guidelines in Handling static sensitive devices on page 7 2 If the blade server is installed in the BladeCenter unit remove it see the documentation that came with your BladeCenter unit for instructions 3 Carefully lay the blade server on a flat static protective surface 4 Open the blade server cover or expansion unit cover see t...

Page 19: ... instructions 10 Install the blade server into the BladeCenter unit or expansion unit and turn on the blade server 11 Install the expansion card device driver See Installing device drivers on page 10 for more information Figure 1 Installing the expansion card into a blade server Chapter 2 Installing an expansion card 9 ...

Page 20: ...card If you have to replace the expansion card use the procedure in this section to install the replacement expansion card The expansion card is a Tier 1 customer replaceable unit CRU Replacement of Tier 1 CRUs is your responsibility If IBM installs a Tier 1 CRU at your request you will be charged for the installation The CRU part number of the Intel 10Gb 2 port Ethernet Expansion Card CFFh is 42C...

Page 21: ...l upward on the edge of the expansion card near the Press to Install label 7 Pivot the expansion card out of the connector and remove the card 8 Install the replacement expansion card See Installing the expansion card on page 8 for the installation procedure Figure 2 Removing the expansion card Chapter 2 Installing an expansion card 11 ...

Page 22: ...12 Intel 10Gb 2 port Ethernet Expansion Card CFFh Installation Guide ...

Page 23: ...mes with IBM systems also describes the diagnostic tests that you can perform Most systems operating systems and programs come with documentation that contains troubleshooting procedures and explanations of error messages and error codes If you suspect a software problem see the documentation for the operating system or program Using the documentation Information about your IBM system and preinsta...

Page 24: ...the U S and Canada call 1 800 IBM SERV 1 800 426 7378 Hardware service and support You can receive hardware service through your IBM reseller or IBM Services To locate a reseller authorized by IBM to provide warranty service go to http www ibm com partnerworld and click Find a Business Partner on the right side of the page For IBM support telephone numbers see http www ibm com planetwide In the U ...

Page 25: ...ILITY OR FITNESS FOR A PARTICULAR PURPOSE Some states do not allow disclaimer of express or implied warranties in certain transactions therefore this statement may not apply to you This information could include technical inaccuracies or typographical errors Changes are periodically made to the information herein these changes will be incorporated in new editions of the publication IBM may make im...

Page 26: ...rvice marks of others Important notes Processor speed indicates the internal clock speed of the microprocessor other factors also affect application performance CD or DVD drive speed is the variable read rate Actual speeds vary and are often less than the possible maximum When referring to processor storage real and virtual storage or channel volume KB stands for 1024 bytes MB stands for 1 048 576...

Page 27: ... connectors or by unauthorized changes or modifications to this equipment Unauthorized changes or modifications could void the user s authority to operate the equipment This device complies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 this device may not cause harmful interference and 2 this device must accept any interference received including interference...

Page 28: ...ing statement Germany Electromagnetic Compatibility Directive Deutschsprachiger EU Hinweis Hinweis für Geräte der Klasse A EU Richtlinie zur Elektromagnetischen Verträglichkeit Dieses Produkt entspricht den Schutzanforderungen der EU Richtlinie 2004 108 EG zur Angleichung der Rechtsvorschriften über die elektromagnetische Verträglichkeit in den EU Mitgliedsstaaten und hält die Grenzwerte der EN 55...

Page 29: ...nigung laut dem Deutschen Gesetz über die elektromagnetische Verträglichkeit von Geräten EMVG bzw der EMC EG Richtlinie 2004 108 EG für Geräte der Klasse A Dieses Gerät ist berechtigt in Übereinstimmung mit dem Deutschen EMVG das EG Konformitätszeichen CE zu führen Verantwortlich für die Konformitätserklärung des EMVG ist die IBM Deutschland GmbH 70548 Stuttgart Generelle Informationen Das Gerät e...

Page 30: ...20 Intel 10Gb 2 port Ethernet Expansion Card CFFh Installation Guide ...

Page 31: ...ructions 8 inventory checklist 2 M MAC addresses 7 Media Access Control addresses 7 N notes important 16 notices 15 electronic emission 17 FCC Class A 17 notices and statements 5 O operating system support 2 overview expansion card 1 P part numbers 10 R removal instructions 10 S Safety Information document 2 software service and support 14 specifications and features 1 2 statements and notices 5 s...

Page 32: ...22 Intel 10Gb 2 port Ethernet Expansion Card CFFh Installation Guide ...

Page 33: ......

Page 34: ... Part Number 44R5396 Printed in USA 1P P N 44R5396 ...

Reviews: