Chapter
5.
Installing
and
removing
replaceable
units
This
chapter
provides
instructions
for
replacing
units
on
the
blade
server.
Replaceable
units
are
components,
such
as
memory
modules,
the
hard
disk
drive,
and
I/O
expansion
cards.
(Some
removal
instructions
are
provided
in
case
you
need
to
remove
one
replaceable
unit
to
install
another.)
The
following
replaceable
units
are
supported:
v
Battery
v
IDE
hard
disk
(one
only)
v
The
bezel
assembly
(control
panel)
v
InfiniBand
cards
(optional)
Installation
guidelines
Before
you
begin,
read
the
following
information:
v
Read
the
safety
information
beginning
on
page
and
the
guidelines
in
This
information
will
help
you
work
safely
with
the
blade
server
and
options.
v
Read
the
information
in
the
BladeCenter
QS20
Installation
and
User's
Guide
.
v
Back
up
all
important
data
before
you
make
changes
to
disk
drives.
v
Have
a
small
flat-blade
screwdriver
and
a
Phillips
screwdriver
available.
v
You
do
not
have
to
turn
off
the
blade
server
or
disconnect
the
BladeCenter
unit
from
power
to
install
or
replace
any
of
the
hot-swap
modules
on
the
rear
of
the
BladeCenter
unit.
v
Before
you
remove
a
hot-swap
blade
server
from
the
BladeCenter
unit,
you
must
shut
down
the
operating
system
by
typing
the
shutdown
-h
now
command.
If
the
blade
server
was
not
turned
off,
press
the
power-control
button
(behind
the
blade-server
control-panel
door)
to
turn
off
the
blade
server.
You
do
not
have
to
shut
down
the
BladeCenter
unit
itself.
v
Blue
on
a
component
indicates
touch
points,
where
you
can
grip
the
component
to
remove
it
from
or
install
it
in
the
blade
server
or
BladeCenter
unit,
open
or
close
a
latch,
and
so
on.
v
Orange
on
a
component
or
an
orange
label
on
or
near
a
component
indicates
that
the
component
can
be
hot-swapped,
which
means
that
if
the
blade
server
or
BladeCenter
unit
and
operating
system
support
hot-swap
capability,
you
can
remove
or
install
the
component
while
the
blade
server
or
BladeCenter
unit
is
running.
(Orange
can
also
indicate
touch
points
on
hot-swap
components.)
See
the
instructions
for
removing
or
installing
a
specific
hot-swap
component
for
any
additional
procedures
that
you
might
have
to
perform
before
you
remove
or
install
the
component.
System
reliability
guidelines
To
help
ensure
proper
cooling
and
system
reliability,
make
sure
that:
v
The
ventilation
holes
on
the
blade
server
are
not
blocked.
v
Each
of
the
blade
bays
on
the
front
of
the
BladeCenter
unit
has
a
blade
server
or
filler
blade
installed.
Do
not
operate
the
BladeCenter
unit
for
more
than
1
minute
without
a
blade
server
or
filler
blade
installed
in
each
blade
bay.
v
You
have
followed
the
reliability
guidelines
in
the
documentation
that
comes
with
the
BladeCenter
unit.
©
Copyright
IBM
Corp.
2006
39
Summary of Contents for BladeCenter QS20
Page 1: ...BladeCenter QS20 Type 0200 Problem Determination and Service Guide SC33 8297 00...
Page 2: ......
Page 3: ...BladeCenter QS20 Type 0200 Problem Determination and Service Guide SC33 8297 00...
Page 8: ...vi BladeCenter QS20 Type 0200 Problem Determination and Service Guide...
Page 26: ...8 BladeCenter QS20 Type 0200 Problem Determination and Service Guide...
Page 49: ...v Operating system control file setup Chapter 2 Diagnostics and troubleshooting 31...
Page 50: ...32 BladeCenter QS20 Type 0200 Problem Determination and Service Guide...
Page 56: ...38 BladeCenter QS20 Type 0200 Problem Determination and Service Guide...
Page 80: ...62 BladeCenter QS20 Type 0200 Problem Determination and Service Guide...
Page 94: ...76 BladeCenter QS20 Type 0200 Problem Determination and Service Guide...
Page 98: ...80 BladeCenter QS20 Type 0200 Problem Determination and Service Guide...
Page 99: ......
Page 100: ...Part Number 42C4969 Printed in USA SC33 8297 00 1P P N 42C4969...