Before you begin:

Read this entire task before completing any individual steps.

5.1

5.2

Fully extend both slide rails.

5.3

Lift the server using the handles

on each side and position the server on the

extended slide rails. Align the three holes of the inner slide rails

with the three holes

on each side of the server.

C

,

D

5.4

5.5

Remove the four blue knobs .

B

Use safe practices when lifting.

Attach the four blue knobs

to the server

The blue knobs are used temporarily

to rest the server on the slide rails for installation. These knobs will be removed after
the server is secured to the slide rails.

B

A

.

Install the server onto the slide rail assembly

5

Before installing the server onto the slide rail assembly, ensure that the
leveling feet are extended and that the stabilizer bracket is correctly installed
to prevent the rack from falling forward.

Using a screwdriver, attach the inner slide
of the slide rails

to each side of the

server by using the system-to-slide-rail
screws . Use a screwdriver to tighten

each of the screws.

D

E

5.7

Using a screwdriver, tighten the two rack-retaining screws to secure the slide rails to
the back of the rack.

5.6

Simultaneously release the blue safety
latches

located near the front of each

slide rail assembly, and slowly push the
server back into the rack.

F

5.8

Slide the server part of the way out of the rack. Using a screwdriver, tighten the front
two rack-retaining screws and the two latch-bracket screws on the front of the rack to
secure the slide rails.

32-55 kg (70.5-121.2 lbs)

Tip:

Pull the server back out and push it in again to make sure that the slide

rails are aligned correctly and that it glides smoothly.

Summary of Contents for 9131-52A

Page 1: ...Quick start guide for p5 520 9131 52A IBM Systems...

Page 2: ...nal injury Before doing a step that contains a caution icon read and understand the caution statement that accompanies it 1 Before you begin Use safe practices when lifting This Quick start guide cont...

Page 3: ...he following resources If you are not installing your server into a rack skip to task 7 Cable the HMC and the server Your IBM reseller IBM Rochester manufacturing automated information line at 1 800 3...

Page 4: ...tion of the installation Use the wrench that was provided with your rack to level the rack by raising or lowering the front and back leveling feet Install the stabilizer bracket on the front of the ra...

Page 5: ...assemblies 4 4 3 Follow the rack mounting template to mark the location on the rack where you will place the server Use the self adhesive placement dots found on the rack mounting template Pull the b...

Page 6: ...k pins with the holes as identified by the self adhesive placement dot Place the rack flange between the slide rail flange and the retracted alignment pins Press the back latch assembly release tab to...

Page 7: ...ensure that the leveling feet are extended and that the stabilizer bracket is correctly installed to prevent the rack from falling forward Using a screwdriver attach the inner slide of the slide rail...

Page 8: ...s attached to the rack frame A E D 6 1 Locate the cable management arm and the two pins E A 6 2 Use the second pin to affix the other end of the cable management arm to the flange that is attached to...

Page 9: ...r see task 9 If you are not using an HMC to manage your server you can use the Integrated Virtualization Manager IVM a graphics terminal or an ASCII terminal If you plan to use IVM which allows you to...

Page 10: ...he power cords for the monitor HMC and external modem into a power source Do not connect the server to a power source until instructed to do so CAUTION This product is equipped with a 3 wire two condu...

Page 11: ...he cables to the appropriate adapter connectors in the PCI slots of your server and PC Cable the server and access the Integrated Virtualization Manager CAUTION This product is equipped with a 3 wire...

Page 12: ...ress for your service processor might be 192 168 2 1 and the subnet mask would be 255 255 255 0 Set the gateway IP address to the same IP address as that of the PC Using a Web browser enter the IP add...

Page 13: ...gs and continue system server firmware boot 8 13 1 2 3 4 In the ASMI navigation area expand Click Select in the AIX Linux partition mode boot field Click Power Restart Control Power On Off System Cont...

Page 14: ...r 8 16 When the system management services SMS menu is displayed in the terminal session over the connection that you set up in step 8 1 choose and follow the menu options to set the optical drive as...

Page 15: ...ormation Initial server setup Create a customized initial server setup checklist You have completed the basic tasks to set up your server access the Follow these steps to create a customized checklist...

Page 16: ...infocenter hardware References in this publication to IBM products or services do not imply that IBM intends to make them available in every country or region IBM the IBM logo and System p are tradem...

Reviews: