2.
Make sure that you have all of the parts of the rack installation kit that are
needed to install the BladeCenter S chassis in a rack. If any parts are missing
or damaged, contact your place of purchase.
Rail
(2)
Cable strap
(6)
Rear of rail
Front of rail
M6 screws
(14)
M5 screws
(4)
Cable ties
(6)
Clip nut
(6)
Cage nut
(6)
Upper Left shipping bracket
Upper Right shipping bracket
Note:
Left and right shipping brackets are required only when the
BladeCenter S chassis is shipped while it is installed in a rack cabinet. An
initial set of shipping brackets is provided in the rack installation kit. If you
need to order additional shipping brackets, you must order the miscellaneous
parts kit.
See the
IBM BladeCenter S Type 8886 Problem Determination and Service Guide
for
the Miscellaneous parts kit part number.
Chapter 2. Installing the BladeCenter S Types 7779 and 8886
33
Summary of Contents for 88861TU
Page 1: ...IBM BladeCenter S Type 7779 8886 Installation and User s Guide...
Page 2: ......
Page 3: ...IBM BladeCenter S Type 7779 8886 Installation and User s Guide...
Page 6: ...iv BladeCenter S Type 7779 8886 Installation and User s Guide...
Page 58: ...46 BladeCenter S Type 7779 8886 Installation and User s Guide...
Page 60: ...48 BladeCenter S Type 7779 8886 Installation and User s Guide...
Page 68: ...56 BladeCenter S Type 7779 8886 Installation and User s Guide...
Page 72: ...60 BladeCenter S Type 7779 8886 Installation and User s Guide...
Page 78: ...66 BladeCenter S Type 7779 8886 Installation and User s Guide...
Page 81: ......
Page 82: ...Part Number 49Y1687 Printed in USA 1P P N 49Y1687...