background image

Installing the Switch

DANGER: 

 SD21-0030.

The User’s Guide also contains further information 
on the following steps.

Installing the Switch into a 19-inch Rack

Fit the brackets as shown in Figure 1 (below) to 
each side of the unit. Following the manufacturer’s 
instructions, secure the unit into the rack.

Installing the Switch on a Wall

Place the Switch the right way up on a hard flat sur-
face, with the front panel facing towards you. Fit 
the brackets as shown in Figure 2 (below) to each 
side of the unit. Ensure that the wall you are using 
is smooth, flat, dry and sturdy. Attach a piece of ply-
wood securely to the wall if necessary. Position the 
base of the Switch against the wall, ensuring that 
the ventilation holes face sidewards and the front 
panel faces upwards. Secure using suitable screws 
and fixings (not provided).

Powering-up the Switch

1

Plug the power cord into the power socket at the 
rear of the Switch.

2

Plug the other end of the power cord into your 
power outlet.

DANGER:

 It is essential that the mains socket 

outlet is installed near to the unit and is accessi-
ble. You can only disconnect the unit by removing 
the appliance coupler from the unit.

The Switch powers-up and runs through its Power 
On Self Test (POST), which takes approximately 12 
seconds. When the POST is complete, check the 
Power/Self Test LED to see that your Switch is oper-
ating correctly

Setting Up for Management

For information about setting up the Switch for 
management, see Chapter 3 of the User’s Guide.

Further Information

You can find further information about installing 
and powering-up the Switch in the IBM 8271 Nways 
Ethernet LAN Switch Model F12 and F24 User’s 
Guide, Part Number 02L0888.

Color

State

Green

The Switch is powered-up and operating
normally.

Yellow

The Switch has failed its POST.

Off

The Switch is not receiving power.

Part Number: 02L0889

Published: July, 1998

F12_F24i.fm  Page 2  Thursday, June 25, 1998  11:47 AM