7009 Compact Server C10 and C20
Dimensions
Height
394 mm
15.5 in.
Width
191 mm
7.5 in.
Width with pedestal
241 mm
9.5 in.
Depth
432 mm
17.0 in.
Weight
Minimum
16 kg
35.0 lbs.
Maximum
18 kg
39.5 lbs.
Electrical
Power source loading
(maximum in kVA)
0.232
Voltage range (V ac)
100 to 127 or 200 to 240 (switchable)
Frequency (hertz)
50 or 60
Thermal output (max)
(C10) 512 Btu/hr
(C20) 544 Btu/hr
Power requirements (max)
(C10) 150 watts
(C20 ) 160 watts
Power factor
0.5 to 0.7
Inrush current
³
75 amps at 120 V ac,
150 amps at 240 V ac
Maximum altitude
2135 m (7000 ft.)
Temperature
Requirements
Operating
16 to 32°C
(60 to 90°F)
Non-Operating
10 to 43°C
(50 to 110°F)
Humidity Requirements
Operating
Non-Operating
(Noncondensing)
8 to 80%
8 to 80%
Wet Bulb
23°C (73°F)
27°C (80°F)
Noise Emissions
¹
Operating
Idle
L
WAd
5.7 bels
5.3 bels
L
pAm
NA
NA
<L
pA
>
m
41 dBA
38 dBA
Impulsive or prominent
discrete tones
No
No
Clearances
Front
Back
Left
Right
Install/Air Flow
²
76 mm(3 in)
152 mm(6 in)
N/A
N/A
Service
Install so that it can be moved to an area providing 457 mm (18 in) on the front and
457 mm (18 in) on the left side.
Footprint
²
Width
241 mm(9.5 in)
Depth
660 mm(26 in)
1. See “Noise Emission Notes” on page 336 for definitions of noise emissions positions.
2. The amount of space needed by the unit during normal operation is indicated by the footprint dimensions.
3. Inrush currents occur only at initial application of power, no inrush occurs during normal power off-on cycle.
12
Site and Hardware Planning Information
Summary of Contents for 7012 397
Page 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 2: ......
Page 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 11: ...Appendix Notices 385 Index 387 Contents ix...
Page 12: ...x Site and Hardware Planning Information...
Page 16: ...xiv Site and Hardware Planning Information...
Page 18: ...xvi Site and Hardware Planning Information...
Page 26: ...8 Site and Hardware Planning Information...
Page 238: ...220 Site and Hardware Planning Information...
Page 246: ...228 Site and Hardware Planning Information...
Page 284: ...266 Site and Hardware Planning Information...
Page 296: ...278 Site and Hardware Planning Information...
Page 366: ...348 Site and Hardware Planning Information...
Page 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Page 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Page 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Page 384: ...366 Site and Hardware Planning Information...
Page 402: ...384 Site and Hardware Planning Information...
Page 404: ...386 Site and Hardware Planning Information...
Page 413: ......
Page 414: ...Printed in USA SA38 0508 20...
Page 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...