2105 Models E10, F10, E20, F20, and 800 Enterprise Storage Servers
For more information on the 2105 Models E10, F10, E20, F20, 800 and E20, F20, or 800 with the
expansion enclosure, see note 1 below.
Dimensions
Height
1915 mm (75.3 in.)
Width E10, F10, E20, F20, 800
1383 mm (54.4 in.)
Width E20, F20, 800 with Expansion Enclosure
2938 mm (115.7 in.)
Depth
909 mm (35.8 in.)
Weight
various configurations
See 2105 Enterprise Storage Server Clearances and Floor Loading on page 240.
Electrical
Power source loading for Max. E10, F20
3.5 kVA
Power source loading for Max. E20, F20
5 kVA
Voltage low range (V ac)
200 to 240
high range (V ac)
380 to 480
Frequency (hertz)
50 or 60
Thermal output (Maximum) E10, F10
11000 Btu/hr
Thermal output (Maximum) E20, F20
16000 Btu/hr
Power factor
0.9
Maximum altitude
2135 m (7000 ft.)
Temperature
Requirements
²
Operating
16 to 32°C
(60 to 90°F)
Non-Operating
10 to 43°C
(50 to 110°F)
Humidity
Requirements
Operating
Non-Operating
(Noncondensing)
20 to 80%
8 to 80%
Wet Bulb
23°C (73°F)
27°C (80°F)
Noise Emissions
³
Operating
L
WAd
All Models
7.5 to 7.75 bels
Service Clearances
See “2105 Enterprise Storage Server Clearances and Floor Loading” on page 240.
Floor Loading
See “2105 Enterprise Storage Server Clearances and Floor Loading” on page 240.
1. For more information see
Enterprise Storage Server Introduction and Planning Guide
, order number GC26-7294.
2. The recommended operating temperature is 22°C (72°F) or lower. At lower temperatures, the risk of failure in the
unit is reduced. If the operating temperature is above 22°C (72°F) for long periods of time, the unit will be
exposed to a greater risk of failure from external causes.
3. See “Noise Emission Notes” on page 336 for definitions of noise emissions positions.
Chapter 5. Physical Characteristics of the 2100 Series
239
Summary of Contents for 7012 397
Page 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 2: ......
Page 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 11: ...Appendix Notices 385 Index 387 Contents ix...
Page 12: ...x Site and Hardware Planning Information...
Page 16: ...xiv Site and Hardware Planning Information...
Page 18: ...xvi Site and Hardware Planning Information...
Page 26: ...8 Site and Hardware Planning Information...
Page 238: ...220 Site and Hardware Planning Information...
Page 246: ...228 Site and Hardware Planning Information...
Page 284: ...266 Site and Hardware Planning Information...
Page 296: ...278 Site and Hardware Planning Information...
Page 366: ...348 Site and Hardware Planning Information...
Page 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Page 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Page 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Page 384: ...366 Site and Hardware Planning Information...
Page 402: ...384 Site and Hardware Planning Information...
Page 404: ...386 Site and Hardware Planning Information...
Page 413: ......
Page 414: ...Printed in USA SA38 0508 20...
Page 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...