Procedure
1. Loosen the front screws (A) that secure the system to the rack from both sides of the system as shown
Figure 68. Removing the front screws and removing the system from the rack
2. Slide the system unit out until the rails lock into place.
Ensure that the cables and cable management arm move freely, and that they do not catch on
anything.
Placing an 5104-22C, 9006-22C, or 9006-22P system into the operating position
To place a system into the operating position, complete the steps in this procedure.
Before you begin
When you place the system in the operating position, ensure that the cables at the rear of the system do
not catch or bind as you push the system unit back into the rack.
Procedure
1. Release the rail safety latches (A) as shown in Figure 69 on page 119, then push the system fully into
the rack.
118 Power Systems: Installing and configuring the IBM Power System LC922 (9006-22P)
Summary of Contents for 5104-22C
Page 1: ...Power Systems Installing and configuring the IBM Power System LC922 9006 22P IBM ...
Page 14: ...xiv Power Systems Installing and configuring the IBM Power System LC922 9006 22P ...
Page 112: ...98 Power Systems Installing and configuring the IBM Power System LC922 9006 22P ...
Page 120: ...or or or 106 Power Systems Installing and configuring the IBM Power System LC922 9006 22P ...
Page 136: ...122 Power Systems Installing and configuring the IBM Power System LC922 9006 22P ...
Page 147: ......
Page 148: ...IBM ...