Figure 66. Releasing and opening the cover
4. Lift up the front of the cover up and remove it from the system.
Installing the service access cover on an 5104-22C, 9006-22C, or 9006-22P system
Learn how to install the service access cover on a rack-mounted 5104-22C or 9006-22C system.
About this task
Attention: For safety, airflow purposes and thermal performance, the service access cover must
be installed and fully seated before you power on the system.
Procedure
1. Place the rear of the cover on the system. Pivot to front of the cover down until it rests on the system.
2. Slide the cover forwards until it latches into place as shown in Figure 67 on page 117.
116 Power Systems: Installing and configuring the IBM Power System LC922 (9006-22P)
Summary of Contents for 5104-22C
Page 1: ...Power Systems Installing and configuring the IBM Power System LC922 9006 22P IBM ...
Page 14: ...xiv Power Systems Installing and configuring the IBM Power System LC922 9006 22P ...
Page 112: ...98 Power Systems Installing and configuring the IBM Power System LC922 9006 22P ...
Page 120: ...or or or 106 Power Systems Installing and configuring the IBM Power System LC922 9006 22P ...
Page 136: ...122 Power Systems Installing and configuring the IBM Power System LC922 9006 22P ...
Page 147: ......
Page 148: ...IBM ...