20
o
Dimension B:
Measure from the underside surface of the
kitchen unit to the bottom of the door hang.
o
Dimension C:
Measure from the underside surface of the
kitchen unit to the top of the next unit door.
o
Subtract measurement
C
from measurement
B.
Place the door
hang
(2)
using this dimension for the vertical position and place
it in the centre for the horizontal position.
o
Screw the door hang
(2)
into place
using the screws
(1)
.
o
Place the cabinet door onto the appliance door by inserting the
adjustment bolts into the slots on the door hang.
o
Place the washers and screw nuts onto the adjustment bolts.
Summary of Contents for HUL136.1
Page 27: ...27 ...