Safety information
Manual safety markings
Danger
Points out an immediate hazardous
situation that must be avoided to
prevent serious injury or death.
Warning
Points out a potential hazardous
situation that must be avoided to
prevent serious injury or death.
Caution
Points out a potential hazardous
situation that must be avoided to
prevent possible moderate injury
and/or property damage.
Note
Points out installation, maintenance and
operational notes to enhance efficiency,
longevity and proper operation of the
boiler.
Important safety instructions
Installation, start-up and servicing of IBC boilers must be performed by competent, qualified, licensed
and trained heating technicians.
Failure to read and comply with all instructions and applicable national and local codes may result in
hazardous conditions that could result in property damage and injury to occupants, and in extreme
cases to death. Keep instructions near the air handling appliance for future reference.
Danger
Should overheating occur or the gas supply fails to shut off, do not turn off or disconnect
the electrical supply to the pump. Instead shut off the gas supply at a location external to
the appliance.
Danger
Do not store or use gasoline or other flammable vapors or liquids in the vicinity of this or
any other appliance. If you smell gas vapors, do not try to operate any appliance - do not
touch any electrical switch or use any phone in the building. Immediately, call the gas
supplier from a phone located remotely. Follow the gas supplier’s instructions, or if the
supplier is unavailable, contact the fire department.
3
Safety information
Summary of Contents for SL SERIES
Page 8: ...Intentionally left empty...
Page 14: ...Intentionally left empty...
Page 66: ...Figure 49 Electric wiring connections 62 Section Installation...
Page 78: ...Intentionally left empty...
Page 92: ...Intentionally left empty...
Page 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices...
Page 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation...
Page 109: ...105 Exploded views of boiler parts...
Page 114: ...110 Section Appendices...
Page 122: ...Intentionally left empty...