![IBC SFT-199 Installation And Operating Instructions Manual Download Page 18](http://html2.mh-extra.com/html/ibc/sft-199/sft-199_installation-and-operating-instructions-manual_3266170018.webp)
INSTALLATION AND OPERATION INSTRUCTIONS
1-10
SFT 199 TANKLESS WATER HEATER
Figure 6: Vertical Concentric Termination - Two Kits
Figure 7: Vertical Concentric Termination - Single Kit
DIRECT VENT CONCENTRIC ROOF TOP TERMINATION
Roof Top Concentric Termination kits are approved for use with this unit.
For vertical roof top concentric terminations, you must follow the installation
instructions supplied with the venting material manufacturer. Care must be taken
to install the termination kit a minimum horizontal distance of 10' (305cm) away
from any portion of the building and a minimum of 18" (46cm) above the roof line
plus the anticipated snow line (s
ee Figures 6 and 7).