IBC P-242 Installation Instructions Download Page 4

1. Using a flat blade screw driver, move the line and

neutral wires from the green terminal block to the

corresponding position on the upper terminal block

for the new controller.

2. Move the wires from the orange terminal block to

the corresponding positions on the low voltage

terminal block on the new controller.

Note

The new controller requires the Therm. 1,

2, 3 or 4 connections to be wired slightly

differently from the way in which the old

controller was wired. See the Electrical

Ladder wiring diagram on the back page.

3. Check that the high voltage terminals are

not

wired into the low voltage wiring block.

4. Replace the electrical cover on the right side of

the controller.

5. Restore power to the boiler and replace the

boiler’s main door.

The new controller takes 90 seconds to come on

line.

6. If you are replacing a 5 button controller, place the

new Electrical Ladder Diagram sticker on the

inside of the boiler's main door.

Programming and testing
connections

Note

To avoid damaging the controller's

touchscreen, use a stylus or clean finger.

After powering up a boiler with a brand new touchscreen

controller, you will need to select the correct boiler model

number from the list provided on the screen. You will find

the model number on the boilers Rating Plate.

4

www.ibcboiler.com

1. From the list, carefully choose the correct

model number. and then press the "Save"

button in the bottom left corner of the screen.

Warning

Important:

Do not tap the "Start"

button to run the "Self Test".

This

is for IBC staff use only.

If you the select the "Start button the

control will attempt to perform the test

and FAIL. Then you will be returned to

the previous screen where you must

choose the correct boiler model

number and press "Save".

2. Program the controller with the settings that

you recorded from the previous controller.

Alternatively, you can use the "Express Setup"

function to set up the boiler.

3. Check that the boiler has registered the

thermostat connections correctly along with

the correct load types and settings.

4. Check that all pumps operate as with the

previous controller.

5. On the

Diagnostics

screen, check the

temperature sensor and pressure sensor

readings.

Reviews: