background image

EX 700 - Convert to LP fuel (P-Kit 1201)

|

7

Completing and affixing the conversion labels

 1.  Fill in the conversion labels (included in the kit) associated with the new fuel type.

 2.  Place the conversion labels onto the boiler at the positions indicated on the last page.

Summary of Contents for P-1201

Page 1: ...cable codes and requirements of the authority having jurisdiction If the information in these instructions is not followed exactly a fire an explosion or production of carbon monoxide may result causi...

Page 2: ...mbly There is no propane orifice Figure 1 Gas valve and fan Fan Mixing device Gas high pressure switch Inlet gas pressure test port location of Gas low pressure switch Low fire adjustment zero offset...

Page 3: ...Carefully separate the two parts remove and retain the O ring for re assembly See in image below 7 Remove the four 4 hex bolts that connect the mixing device to the air filter box The gasket should re...

Page 4: ...iler control upon a call for heat or DHW turns on the combustion fan for a 20 second pre purge then energizes the spark electrode and gas valve for a 4 second trial for ignition If the burner does not...

Page 5: ...high fire 5 Before firing the boiler turn the high fire gas air ratio adjustment screw clockwise to 1 full turn to decrease the fuel leaning the mixture before firing up the boiler 6 Before you change...

Page 6: ...esults to confirm correct settings Note Clock the gas meter to confirm full maximum rating plate input Check the measured results with Table for Rated Input of a Converted Boiler 5 Run the boiler to l...

Page 7: ...t 1201 7 Completing and affixing the conversion labels 1 Fill in the conversion labels included in the kit associated with the new fuel type 2 Place the conversion labels onto the boiler at the positi...

Page 8: ...Where to place conversion labels on the boiler 8...

Reviews: