
EN
TECHNICAL DATA
Minimum dynamic pressure:______________________________________________________________0.5 bar
Maximum operational pressure:_____________________________________________________________5 bar
Recommended operational pressure:______________________________________________________1-5 bar
It’s recommended to use a pressure reducer in case of
static pressure superior than 5 bar inside the waterpipe.
Maximum hot water temperature:___________________________________________________________80°C
INSTALLATION, MAINTENANCE AND PRELIMINARY CHECKING PROCEDURE
In order to get your device work correctly and fi ne in time, must ensure compliance with the
mode of installation and maintenance described in this booklet. Relying on a qualifi ed plumber.
Make sure that the system is free from all debris and impurities existing.
INSTALLATION
Fig. 1:
Arrange the pipes of the water supply with a wheelbase of 150 mm, using the template
available and the help of a bubble level to ensure the proper horizontality.
Drill holes for the anchors.
Connect the attacks to the pipes of the water network, using hemp or PTFE to ensure tightness
on the threads.
Fig. 2:
Once the attacks are connected verify that they protude 21 mm maximum from the wall.
Fig. 3:
Connect the column to the thermostatic group, inserting the flat gasket.
Fig. 4:
Fix the support column.
Fig. 5:
Secure the unit to the wall:
- Insert the rawplugs into the wall hoses.
- Insert the rear trimring and the gaskets.
- Connect the thermostatic group to the wall attacks, tightening the nut to ensure
tightness.
- Insert the screws and tighten until it snaps into the wall, while you’re placing the
column to the upper support fi xing it with the grubscrew.
Fig. 6:
Screw the shower arm to the column, using hemp or PTFE to ensure tightness. Screw the
showerhead to the shower arm, inserting the flat gasket.
After connecting the body to the system, turn on the stopcocks and check that the mixer tap unit
operates correctly. Keep the tap pressurised for a few minutes checking eventual leaks.
CLEANING
In order to get a correct cleaning, exclusiveny wash with soap and water, rewash and dry with
deerskin and a soft cloth. Avoid to use alcohol, solvents, solid or liquid detergents made by
corrosive or acid substances, towel made by synthetic materials, abrasive sponges, because they
could irreversibly alterate the treated surfaces.
Summary of Contents for HERMES HR199
Page 1: ...ISTRUZIONI DI MONTAGGIO FITTING INSTRUCTIONS NOTICE DE MONTAGE HERMES 199 HR199 HL199...
Page 5: ...Fig 1 Fig 2 Fig 3 Fig 4 G1 2 M...
Page 6: ...Fig 5 Fig 6...
Page 7: ......
Page 8: ......