background image

INSTALLATION 
A. Enrolling code 

1. Loosen the screw of the 

i4H-

TX-3AC, open the upper case, select right position of JP1 and JP2 (default at 100A, both

 

jumpers have to be set for full scale of 10A or 100A) and connect the wires of AC Clamp probe (no polarity) to the

 

terminals. And then insert two AAA alkaline batteries..

2. Keep pressing the Clear/Enroll Button on 

i4H-

LS-20 for over 3 seconds and then release it, the 

i4H-

LS-20 would

 

keep beeping and all LEDs blink. This means the system is ready for enrolling device.

3. Within  30  seconds  press  the  TEST  button  on 

i4H-

TX-3AC  PCB.  If  you  hear  3  short  beeps  soon  later  then 

enrolling

 

successes, otherwise you will hear one long beep after 30 seconds that means enrolling fails, you have 

to repeat

 

enrolling action.

4.

Now  the  Base  Unit  has  learnt  one  type  of  the  two  sensors  (AC  Meter  or  Temperature  sensor),  you  need  to

repeat the steps 2 &b 3 to enroll the other type sensor.

Note: Avoid activating any other sensors during the 30 seconds Device Enroll period. 

Remarks: 1) In case you have to change the device‟s attribute, please do it on the cloud web directly, or refer to 

HyperSecureLink software user guide to change it by computer. 

2) The sensor can be set as an 

Alarm Device

 or a 

Control Device

. (Refer to the last page)

3) The settings of the AC Meter & Temperature Limits can be done by the 

i4H app

 or HyperSecurLink software.

4) If the AC Meter or temperature reading is over their limits, the  base unit would send control command to

control the switches or activate Special Sensor alarm.

 

If both high/low limits are set, the high limit should be greater than the low limit at least for 3 readings. 

Note: If the sensor works in the temperature range over  +50

 to -20

 for a long time, the device’s life will be 

reduced and the performance maybe degraded. 

B. Mounting & operation

 

It is recommended to attach the sensor on a flat surface of the wall by the Velcro supplied. Do not mount the transmitter 
on the metal surface of the power  distribution  panel,  since  the  RF  transmission  range  will  be  seriously  shrunk  due  to 
radio signal attenuation. 

If the transmitter is put in a closed metal box, there will be a large reduction in radio range. The user should move 
the Base Unit close to the sensor or use a repeater to extend radio distance. 
To  measure  the  AC  current  the  clamp  probe  can  only  pass  ONE  conductor.  Normally  there  are  two  or  three 
conductors in a power cord, you have to separate the wires and identify the conductor that carries the current (not 
grounding wire). 

C. Testing 

Each time when you press the TEST button on the sensor it will send the AC Meter reading (LED flashes twice) or 
temperature (LED flashes once) alternatively. Check these on the cloud or HyperSecureLink. 

E. Measuring data and display 

To save battery power, the device sends reading automatically only when the temperature change is over 1

 or AC 

Meter Reading change is over 2 readings. 
If there is no change for a long time, the device will send the reading hourly to update the memory and display. 

Note: For the selection of 10A as full scale. 

1, Both JP1 and JP2 must be set to 10A position. 
2, The reading has to be divided by 10. Ex. Reading=76 means 7.6 A. 

Each  time  when  you  press  the  TEST  button  on  the  sensor  it  will  send  the  current  AC  Meter  reading  (LED  two
flashes) or temperature (LED one flash) alternatively.

Reviews: