background image

 

CABLINE-CX II PLUG With Cover Assembly Manual

 

Document No. 

ASM-17008

 

 

 
 

 

10

  / 

16

 

Confidential C                                                                   

5-2. SHELL-A 取扱注意事項

  (

Cautions in treating SHELL A) 

SHELL-A はキャリア付きリール状態にて納品されます。SHELL-A をキャリアから折り取る手順を明記します。 
SHELL A is delivered in the reel with a carrier. The following is the method to cut SHELL A from Carrier. 
 

 

金属用はさみ等を用いて、キャリアを左下写真のカットライン(緑線)にて切断する。 
Cut carrier on the cut line of the left below picture (green line) by a scissors for metal. 
 
 
 

           
 
 
 

                           
 
 

 

SHELL-A の中心部を持ち、±45°の範囲で 1 往復させてノッチ部から切り離す。 
もし、切り離れない場合は、この往復動作を繰り返して切り離す。 
切り離し後はノッチ折り取り部にバリ発生なきことを確認してください。(Photo.7) 
Hold the center of Plug shell-A and cut it off from Notch by  ±45 degrees of reciprocating work. 
When it does not be cut, try again this reciprocating work. 
After separated, check there is no burr around the cut part.(Photo.7) 

 
   
 
 
 
 
 

 
SHELL-A  ノッチ部状態  (SHELL-A Detail of Notch) 

           
 
 
                         

 

 

 

 

Carrier 

Notch 

Photo.4 Before cut 

Photo.5 After cut 

Cut Line 

Photo.6 Cut condition 

Photo.7 After cut 

Without burrs 

45° 

45° 

Photo.9 Bottom side 

view 

Photo.8 Upper side view 

Summary of Contents for CABLINE-CX II With Cover

Page 1: ...BLINE CX II PLUG With Cover Part No 20977 Assembly Manual 2 S19503 September 4 2019 S Yamaguchi T Kurachi H Ikari 1 S17876 November 28 2017 R Hoshino T Yayoshi M Takemoto 0 S17752 October 13 2017 R Ho...

Page 2: ...COVER CABLE ASS Y 20977 040T 01 Discrete P N HOUSING ASS Y 20974 040T 01 LOCK BAR ASS Y 20975 040T 01 SHELL A 3655 0401 3 Fixtures 3 1 Components and Instruments used in the condition confirmation Pu...

Page 3: ...g time 2 0sec 2nd 2nd heat temp 320 rise time 0 5sec holding time 5 0sec Heater tip Pressure 11N This pulse heat condition was evaluated and confirmed by our pulse heat jig and instruments The most op...

Page 4: ...nt No ASM 17008 4 16 Confidential C 5 Work procedures 5 1 Soldering of center conductor The cables have to be fabricated as shown below in advance of soldering Micro coax cable Unit mm Micro coax cabl...

Page 5: ...CABLINE CX II PLUG With Cover Assembly Manual Document No ASM 17008 5 16 Confidential C Discrete cable Unit mm...

Page 6: ...ase confirm all contacts were applied flux Fig 1 After applying flux Photo 1 After applying flux Photo 2 Please do not apply flux too much like Photo 2 It can cause flux splash or leak to the mating a...

Page 7: ...and locate solder bar at center of soldering point Fig 2 Set solder bar Set the cable Fig 3 Setting Cable MCX Discrete cable Jacket When using a discrete cable set it so that the end of the jacket an...

Page 8: ...lse heater See photo 3 of soldering condition Photo 3 AWG 44 1 NG When solder bridge is appeared between the terminal try heating again with pulse heater only one time If the bridge isn t repaired rep...

Page 9: ...ore assemble SHELL A Fig 6 Caution Do not forcedly pull the cable toward red arrow direction after soldering or apply excessive load on the soldered area or it may peel the solder Fig 6 Fig 6 Cause of...

Page 10: ...below picture green line by a scissors for metal SHELL A 45 1 Photo 7 Hold the center of Plug shell A and cut it off from Notch by 45 degrees of reciprocating work When it does not be cut try again th...

Page 11: ...photo below to cut off by force Red arrow direction burrs and transformation can be caused 5 3 LOCK BAR ASS Y Assembly of LOCK BAR ASS Y Fig 7 LOCK BAR ASS Y HOUSING ASS Y LOCK BAR ASS Y is assembled...

Page 12: ...Fig 8 LOCK BAR ASS Y 120 HOUSING ASS Y SHELL A Fig 9 LOCK BAR ASS Y is tilted to the cable side 120 degrees Place the SHELL A on the upper surface of the HOUSING ASS Y and push only the red shaded are...

Page 13: ...anual Document No ASM 17008 13 16 Confidential C point Fig 10 Check point Fig 10 from the front of connector as shown below Fig 10 Confirm whether SHELL A Check point Y OK NG Red line below blue line...

Page 14: ...Assembly Manual Document No ASM 17008 14 16 Confidential C points Confirm whether Fig 11 points is assembled properly and SHELL A locks properly Fig 11 Assembly of SHELL A LOCK BAR ASS Y Closed LOCK...

Page 15: ...ignated points Fig 12 13 point Conditions of Soldering iron refer to sheet 8 Fig 12 Soldering of Shell A and Ground Bar Fig 13 Soldering of Shell B and Ground bar Shell A and Shell B When soldering do...

Page 16: ...er Assembly Manual Document No ASM 17008 16 16 Confidential C 5 5 Cable fixation SHELL LOCTITE 352 Fix the cable and SHELL with the bond Recommended Bond LOCTITE 352 Fig 14 Bonding Fig 15 Soldering Bo...

Reviews: