CABLINE-CBL PLUG Assembly Manual
Document No.
ASM-09002
3
/
18
Confidential C
5.
作業手順
(Work procedures)
:
5-1.
芯線の半田付け
(Soldering of center-conductor)
①まず適合ケーブルの端末処理形状を下図の様にして下さい。
The cables have to be fabricated as shown below in advance of soldering.
Discrete
A WG#36
SGC.
a
b
c
#40
#42
#44
0.090
0.075
0.063
0.18
0.20
0.21
0.26
0.28
0.33
SGC. Dimension
PART NO.
20472-030T-10
Pos.
30
A
11.6
0.4
±0 .1
A
±0 .1
1
.
5
5
A +2.0
(
3
~
7
)
0
.
5
±
0
.
0
5
0
.
9
±
0
.
0
5
0
.
1
M
A
X
.
(
6
~
9
)
A+0.8
±0 .1
Cut L ine
Laminate Ta pe
Center Co nductor
Soldering Coat
Jacket
Outer Con ductor
Insulat or
φ a
φ b
0.46
±0. 03
φ c
φ0. 15
φ0.25
20472-040T-10
40
15.6
20472-030T-20
20472-040T-20