Model Number
HZ
-WT-ADV-24 User Guide
Page | 12
©
2021
Hangzhou Weiqi Electronic Co., Ltd.
All rights reserved.
2.0
I
NSTALLATION
C
ONSIDERATIONS
C
OMPONENTS OF THE
S
YSTEM
Figure 2
Ⅰ
The Main control unit
includes the data acquisition and control board, touch panel LCD display,
magnetic and IR transmission, detection circuitry and power supply. It is the core module of the system.
Ⅱ
Left side panel
and
Ⅲ
right side panel:
Provide a connection point for external power, emit and
capture the signals employed for detection, and display alarm related LED indications along the edge to
indicate the locations of detected materials.
Ⅳ
.Detection channel
:
Formed by the Main Control Unit and the Side Panels, this is the detection area
through which persons to be screened must pass.
V. Remote control unit
: U
sed primarily for setup and troubleshooting, allows operation of the metal
detector without having to touch the display unit.
C
HECKPOINT LAYOUT
To achieve the maximum flow of people, the plan for checkpoints should be developed
carefully before installing the device. In addition to considering mechanical and electronic
interference, factors at the installation site and other security checkpoints should be
appropriately organized and expertly evaluated. Consider the following suggestions when
designing the checkpoints:
- Arrange the queues waiting to enter the detectors to ensure that only one person
passes through the WTMD at a time;