Page67
Construction Equipment
②
③
④
⑤
⑥
⑦
①
⑤
④
②
⑥
Section Y-Y
X
X
Y
Y
①
②
⑥
Section X-X
⑥
③
①
⑦
**
①
~
⑦
Regulator Parts Name **
①
: Lever 1
②
: Lever 2
③
: Compensator Piston
④
: Pilot Piston
⑤
: Adjust Screw(QMC)
⑥
: Feed Back Lever
⑦
: Spool
2) The Type and circuit of regulator
2) The Type and circuit of regulator
Summary of Contents for R140-7
Page 1: ...Service Guide Crawler Excavator...
Page 4: ...Page3 Construction Equipment Specification Comparisions...
Page 8: ...Page7 Construction Equipment Hydraulic System...
Page 16: ...Page15 Construction Equipment 3 Hydraulic Circuit 3 1 Main Circuit...
Page 17: ...Page16 Construction Equipment 3 2 Pilot Circuit Crawler Type...
Page 18: ...Page17 Construction Equipment 3 3 Pilot Circuit Wheel Type...
Page 20: ...Page19 Construction Equipment R210LC 7 4 1A Main Control Valve Kawasaki 4 Main Components...
Page 21: ...Page20 Construction Equipment R210LC 7 Upper view Side view...
Page 22: ...Page21 Construction Equipment Bottom view Side view R210LC 7...
Page 23: ...Page22 Construction Equipment R210LC 7 LH RH...
Page 24: ...Page23 Construction Equipment R210LC 7 R290LC 7A 1 Foot Relief Valve...
Page 25: ...Page24 Construction Equipment R210LC 7 R290LC 7A 2 Direction Control Valve...
Page 27: ...Page26 Construction Equipment R210LC 7 R290LC 7A...
Page 29: ...Page28 Construction Equipment R210LC 7 R290LC 7A...
Page 31: ...Page30 Construction Equipment...
Page 32: ...Page31 Construction Equipment Arm Roll Out...
Page 33: ...Page32 Construction Equipment 6 Boom Priority System Boom Swing Operation...
Page 34: ...Page33 Construction Equipment 7 Straight Travel Valve...
Page 37: ...Page36 Construction Equipment R290LC 7 10 Straight Travel Valve at Neutral position...
Page 38: ...Page37 Construction Equipment R290LC 7 11 Travel and Swing Simultaneously...
Page 43: ...Page42 Construction Equipment R140W 7...
Page 59: ...Page58 Construction Equipment Pc42 Pc42 12 3 ARM Regeneration Action ARM 1 ARM Regen ARM 2...
Page 74: ...Page73 Construction Equipment...
Page 76: ...Page75 Construction Equipment P1 P2 Pf EPPR Drain Drain R210LC 7...
Page 77: ...Page76 Construction Equipment R290LC 7 8 Pump Regulation Schematic...
Page 85: ...Page84 Construction Equipment Minimum flow Maximum flow max REGULATOR REGULATOR...
Page 94: ...Page93 Construction Equipment...
Page 95: ...Page94 Construction Equipment R210LC 7 21 Flow Increasing Function...
Page 96: ...Page95 Construction Equipment R210LC 7 22 Flow Reducing Function...
Page 97: ...Page96 Construction Equipment R210LC 7 23 Overload Prevention Function...
Page 98: ...Page97 Construction Equipment R210LC 7 24 Flow Reset Function...
Page 108: ...Page107 Construction Equipment R290LC 7A 4 3 Pilot Circuit...
Page 109: ...Page108 Construction Equipment R290LC 7A Operated Position...
Page 110: ...Page109 Construction Equipment 4 4 Swing Motor 1 View of Swing Motor R140LC 7...
Page 112: ...Page111 Construction Equipment R210LC 7 2 Swing Circuit Operation...
Page 113: ...Page112 Construction Equipment R290LC 7A...
Page 114: ...Page113 Construction Equipment R290LC 7A...
Page 115: ...Page114 Construction Equipment R290LC 7A Neutral Position Swing is not operated...
Page 116: ...Page115 Construction Equipment R290LC 7A 3 Swing Port Relief Valve...
Page 117: ...Page116 Construction Equipment R290LC 7A 110bar...
Page 119: ...Page118 Construction Equipment R290LC 7A 5 Swing Brake Neutral Position...
Page 120: ...Page119 Construction Equipment R290LC 7A 6 Swing Brake Operating Position...
Page 121: ...Page120 Construction Equipment R290LC 7A...
Page 122: ...Page121 Construction Equipment R290LC 7A...
Page 123: ...Page122 Construction Equipment R290LC 7A 7 Antirotation Valve...
Page 124: ...Page123 Construction Equipment...
Page 126: ...Page125 Construction Equipment R290LC 7A 8 Make Up Valve...
Page 132: ...Page131 Construction Equipment 2 Counterbalance Valve...
Page 133: ...Page132 Construction Equipment Speed Control Jeil 1st Speed Control...
Page 134: ...Page133 Construction Equipment Speed Control Jeil 2nd Speed Control...
Page 135: ...Page134 Construction Equipment Speed Control...
Page 139: ...Page138 Construction Equipment...
Page 140: ...Page139 Construction Equipment 1 0 1 5...
Page 141: ...Page140 Construction Equipment C balance spool check V V...
Page 142: ...Page141 Construction Equipment Brake release A B C D brake release pressure 9Kg...
Page 144: ...Page143 Construction Equipment Main pressure 270 bar 1st speed changed 2 Speed Spool...
Page 145: ...Page144 Construction Equipment R290LC 7A Travel Motor Negative Brake...
Page 146: ...Page145 Construction Equipment R290LC 7A Brake Valve...
Page 147: ...Page146 Construction Equipment R290LC 7A Brake Valve Accelerating Position...
Page 151: ...Page150 Construction Equipment R290LC 7A 4 7 Remote Control Pedal...
Page 152: ...Page151 Construction Equipment R290LC 7A 4 8 Turning Joint...
Page 156: ...Page155 Construction Equipment 5 2 Single Acting Circuit...
Page 157: ...Page156 Construction Equipment 5 3 Double Acting Circuit...
Page 158: ...Page157 Construction Equipment 5 4 Comparison Table...
Page 160: ...Page159 Construction Equipment Electric New CAPO System Computer Aided Power Optimization...
Page 173: ...Page172 Construction Equipment R210LC 7 Px Py 2 Circuit...
Page 186: ...Page185 Construction Equipment 1 12 Monitoring Display on Cluster...
Page 187: ...Page186 Construction Equipment 1 Description of Monitoring Display...
Page 188: ...Page187 Construction Equipment...
Page 189: ...Page188 Construction Equipment...
Page 190: ...Page189 Construction Equipment...
Page 192: ...Page191 Construction Equipment 3 Engine Error Codes List for R290 360LC 7 Cummins QSB QSC...
Page 193: ...Page192 Construction Equipment...
Page 194: ...Page193 Construction Equipment...
Page 195: ...Page194 Construction Equipment 3 Engine Error Codes List for R450LC 7 Cummins QSM...
Page 196: ...Page195 Construction Equipment...
Page 197: ...Page196 Construction Equipment...
Page 206: ...Page205 Construction Equipment 6 Preparation for Emergency Operation...
Page 209: ...Page208 Construction Equipment 1 16 Engine rpm control System Mechanically controlled CMS E G...
Page 218: ...Page217 Construction Equipment 2 1 Components Location Cabin Fuse box POWER RY SAFETY RY...
Page 227: ...Page226 Construction Equipment...