www.hyundaipowerproducts.co.uk
40
Operation
Starting
1.
Before connecting to the mains power supply, always check the switch on the
machine is in the OFF position.
Image 1.
2.
Connect to water supply
3.
Press the On/Off switch on the machine
(U)
to the ON position.
Image 2.
4.
Turn the water supply on.
Image 3.
!
YOU MUST read and understand the full safety instruction manual before starting
the machine.
Min. 15L/min
Max. 1MPa
Image 1
Image 2
Image 3
5-40°C
U
Continued on next page