background image

1-17

Item

Qty

HX130A LCR

HX130A LCRD

EA

kg

lb

kg

lb

Upperstructure assembly

·

Main frame weld assembly

1

1152 

2540 

1152

2540

·

Engine 

assembly

1

348 767 348 767 

·

Aftertreatment 

assy

1

30 66 30 66 

·

Main pump assembly

1

88 

194 

88 

194 

·

Main control valve assembly

1

140 

309 

140 

309 

·

Swing motor assembly

1

130 

287 

130 

287 

·

Hydraulic oil tank WA

1

182 

402 

182 

402 

·

Fuel 

tank 

WA

1

162 357 162 357 

·

Counterweight

1

2100 4630 2100 4630 

·

Cab 

assembly

1

450 992 450 992 

Lower chassis assembly

·

Track frame weld assembly

1

1226 

2703 

1365 

3009 

·

Dozer blade assembly  

1

-

-

475 

1047 

·

Swing bearing  

1

262 

578 

262 

578 

·

Travel motor assembly

2

278 

613 

278 

613 

·

Turning 

joint

1

59 130 59 130 

·

Sprocket 

2

40 87 40 87 

·

Track recoil spring 

2

93 

206 

93 

206 

·

Idler 

2

108 238 108 238 

·

Upper 

roller 

2

12 27 12 27 

·

Lower 

roller 

12

25 54 25 54 

·

Track 

Guard

2

31 68 31 68 

·

Track-chain assembly (500 mm, 43 link)

2

716 

1579 

716 

1579 

·

Track-chain assembly (600 mm, 43 link)

2

796 

1754 

796 

1754 

·

Track-chain assembly (700 mm, 43 link)

2

875 

1929 

875 

1929 

·

Track-chain assembly (600 mm, 43 link)-HW

2

960 

2116 

960 

2116 

·

Track-chain assembly (700 mm, 43 link)-HW

2

1058 

2332 

1058 

2332 

·

Track-chain assembly (500 mm, 43 link)-rubber pad

2

793 

1749 

793 

1749 

Front attachment assembly 

·

4.3 m mono boom assembly

1

702 

1548 

702 

1548 

·

4.56 m 2-piece boom assembly

1

986 

2173 

986 

2173 

·

2.26 m arm assembly

1

364 

803 

364 

803 

·

1.96 m arm assembly

1

337 

743 

337 

743 

·

2.81 m arm assembly

1

427 

941 

427 

941 

·

2.26 m arm assembly (w/o reinforce)

1

356 

785 

356 

785 

·

2.81 m arm assembly (w/o reinforce)

1

419 

923 

419 

923 

·

0.58 m³ bucket 

assembly

1

439 967 439 967 

·

0.50 m³ bucket 

assembly

1

422 931 425 936 

·

0.61 m³ bucket 

assembly

1

474 1045 422  931 

·

0.50 m³ bucket assembly

1

425 

936 

474 

1045 

·

0.59 m³ bucket 

assembly

1

473 1043 473 1043 

·

Boom cylinder assembly 

2

98 

216 

98 

216 

·

Arm cylinder assembly

1

118 

260 

118 

260 

·

Bucket cylinder assembly

1

96 

212 

96 

212 

·

2-piece boom cylinder assembly

1

170 

375 

170 

375 

·

Dozer cylinder assembly

2

53 

117 

53 

117 

·

Bucket control linkage total

1

112 

247 

112 

247 

 

 

This information is different with operating and transportation weight because it is not including harness, pipe, oil, fuel so on.

This information is different with operating and transportation weight because it is not including harness, pipe, oil, fuel so on.

 

 Refer to Transportation for actual weight information and Specifications for operating weight.

Refer to Transportation for actual weight information and Specifications for operating weight.

4. WEIGHT

4. WEIGHT

Summary of Contents for HX130A LCR

Page 1: ...HX130A LCR CRAWLER EXCAVATOR SERVICE MANUAL...

Page 2: ...tion 167 Group 5 Combined Operation 179 Section 4 Electrical System 188 Group 1 Component Location 189 Group 2 Electrical Circuit 191 Memorandum 194 Group 3 Electrical Component Specification 211 Grou...

Page 3: ...Group 5 Air Conditioner Heater System 424 Section 7 Maintenance Standard 427 Group 1 Operational Performance Test 428 Group 2 Major Component 448 Group 3 Track and Work Equipment 456 Section 8 Disass...

Page 4: ...ection explains the hydraulic circuit single and combined operation SECTION 4 ELECTRICAL SYSTEM SECTION 4 ELECTRICAL SYSTEM This section explains the electrical circuit monitoring system and each comp...

Page 5: ...ost up to date information before you start any work Filing method Filing method See the page number on the bottom of the page File the pages in correct order Following examples shows how to read the...

Page 6: ...ove the decimal point one place to the left to convert it to 55 mm Carry out the same procedure as above to convert 55 mm to 2 165 inches The original value 550 mm was divided by 10 so multiply 2 165...

Page 7: ...90 3 543 3 583 3 622 3 661 3 701 3 740 3 780 3 819 3 858 3 898 Kilogram to Pound Kilogram to Pound 1 kg 2 2046 lb 0 1 2 3 4 5 6 7 8 9 0 2 20 4 41 6 61 8 82 11 02 13 23 15 43 17 64 19 84 10 22 05 24 25...

Page 8: ...23 247 23 511 90 23 775 24 040 24 304 24 568 24 832 25 096 25 631 25 625 25 889 26 153 Liter to U K Gallon Liter to U K Gallon 1 0 21997 U K Gal 0 1 2 3 4 5 6 7 8 9 0 0 220 0 440 0 660 0 880 1 100 1 3...

Page 9: ...5 643 7 90 651 0 658 2 665 4 672 7 679 9 687 1 694 4 701 6 708 8 716 1 100 723 3 730 5 737 8 745 0 752 2 759 5 766 7 773 9 781 2 788 4 110 795 6 802 9 810 1 817 3 824 6 831 8 839 0 846 3 853 5 860 7 1...

Page 10: ...09 1323 1337 1351 1365 1380 1394 1408 100 1422 1437 1451 1465 1479 1493 1508 1522 1536 1550 110 1565 1579 1593 1607 1621 1636 1650 1664 1678 1693 120 1707 1721 1735 1749 1764 1778 1792 1806 1821 1835...

Page 11: ...1 0 32 2 90 194 0 26 1 15 5 0 6 7 20 68 0 12 8 55 131 0 32 2 90 194 0 25 6 14 6 8 6 1 21 69 8 13 3 56 132 8 32 8 91 195 8 25 0 13 8 6 5 6 22 71 6 13 9 57 134 6 33 3 92 197 6 24 4 12 10 4 5 0 23 73 4 1...

Page 12: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...

Page 13: ...e excavator attach a Do Not Operate Do Not Operate tag on the right side control lever USE HANDHOLDS AND STEPS USE HANDHOLDS AND STEPS Falling is one of the major causes of personal injury When you ge...

Page 14: ...Wear goggles or safety glasses PROTECT AGAINST NOISE PROTECT AGAINST NOISE Prolonged exposure to loud noise can cause impairment or loss of hearing Wear a suitable hearing protective device such as e...

Page 15: ...excavator starts to move Use a signal person when moving swinging or operating the machine in congested areas Coordinate hand signals before starting the excavator OPERATE ONLY FORM OPERATOR S SEAT O...

Page 16: ...YSTEM SAFELY Explosive release of fluids from pressurized cooling system can cause serious burns Shut off engine Only remove filler cap when cool enough to touch with bare hands HANDLE FLUIDS SAFELY A...

Page 17: ...ide or in a well ventilated area Dispose of paint and solvent properly Remove paint before welding or heating If you sand or grind paint avoid breathing the dust Wear an approved respirator If you use...

Page 18: ...serious injury To prevent accidents use care when working around rotating parts AVOID HIGH PRESSURE FLUIDS AVOID HIGH PRESSURE FLUIDS Escaping fluid under pressure can penetrate the skin causing serio...

Page 19: ...ble materials Pressurized lines can be accidentally cut when heat goes beyond the immediate flame area Install fire resisting guards to protect hoses or other materials PREVENT BATTERY EXPLOSIONS PREV...

Page 20: ...or lime to help neutralize the acid 3 Flush your eyes with water for 10 15 minutes Get medical attention immediately If acid is swallowed 1 Drink large amounts of water or milk 2 Then drink milk of ma...

Page 21: ...DO NOT pour oil into the ground down a drain or into a stream pond or lake Observe relevant environmental protection regulations when disposing of oil fuel coolant brake fluid filters batteries and ot...

Page 22: ...r Control link Control rod Lower roller Idler Upper roller Fuel tank Hydraulic tank Main pump Tooth Turning joint Swing motor Engine Radiator Charge air cooler Bucket Main control valve Battery Oil co...

Page 23: ...80 10 1 3080 10 1 3080 10 1 Minimum ground clearance H 435 1 5 435 1 5 435 1 5 Rear end distance I 1520 5 0 1520 5 0 1520 5 0 Rear end swing radius I 1520 5 0 1520 5 0 1520 5 0 Distance between tumble...

Page 24: ...d G 2035 6 8 2035 6 8 Overall height of handrail G 3080 10 1 3080 10 1 Minimum ground clearance H 435 1 5 435 1 5 Rear end distance I 1520 5 0 1520 5 0 Rear end swing radius I 1520 5 0 1520 5 0 Distan...

Page 25: ...d distance I 1520 5 0 1520 5 0 1520 5 0 Rear end swing radius I 1520 5 0 1520 5 0 1520 5 0 Distance between tumblers J 2780 9 1 2780 9 1 2780 9 1 Undercarriage length without grouser K 3457 11 4 3457...

Page 26: ...60 0 10 260 0 10 Rear end distance I 1520 5 0 1520 5 0 Rear end swing radius I 1520 5 0 1520 5 0 Distance between tumblers J 2780 9 1 2780 9 1 Undercarriage length without grouser K 3457 11 4 3457 11...

Page 27: ...radius F 2340 7 8 2275 7 6 2470 8 1 Bucket digging force kN SAE 83 5 91 83 2 90 7 83 5 91 kgf 8510 9280 8480 9250 8510 9280 lbf 18761 20459 18695 20393 18761 20459 kN ISO 98 106 9 97 6 106 4 98 106 9...

Page 28: ...16 11 4860 15 11 Max vertical wall digging depth C 4680 15 4 4370 14 4 Max digging height D 8880 29 2 8650 28 5 Max dumping height E 6390 21 0 6160 20 3 Min swing radius F 2430 8 0 2220 7 3 Bucket di...

Page 29: ...assembly 500 mm 43 link rubber pad 2 793 1749 793 1749 Front attachment assembly 4 3 m mono boom assembly 1 702 1548 702 1548 4 56 m 2 piece boom assembly 1 986 2173 986 2173 2 26 m arm assembly 1 364...

Page 30: ...ng load with the machine on firm level ground or 87 of full hydraulic capacity The Lift point is bucket pivot mounting pin on the arm without bucket mass Indicates load limited by hydraulic capacity L...

Page 31: ...of the HX series does not exceed 75 of tipping load with the machine on firm level ground or 87 of full hydraulic capacity The Lift point is bucket pivot mounting pin on the arm without bucket mass In...

Page 32: ...on ISO 10567 Lifting capacity of the HX series does not exceed 75 of tipping load with the machine on firm level ground or 87 of full hydraulic capacity The Lift point is bucket pivot mounting pin on...

Page 33: ...on ISO 10567 Lifting capacity of the HX series does not exceed 75 of tipping load with the machine on firm level ground or 87 of full hydraulic capacity The Lift point is bucket pivot mounting pin on...

Page 34: ...capacity are based on ISO 10567 Lifting capacity of the HX series does not exceed 75 of tipping load with the machine on firm level ground or 87 of full hydraulic capacity The Lift point is bucket piv...

Page 35: ...capacity are based on ISO 10567 Lifting capacity of the HX series does not exceed 75 of tipping load with the machine on firm level ground or 87 of full hydraulic capacity The Lift point is bucket piv...

Page 36: ...ies for specific work tools Consult with your local Hyundai dealer regarding the lifting capacities for specific work tools and attachments and attachments Failure to comply to the rated load can caus...

Page 37: ...t with your local Hyundai dealer regarding the lifting capacities for specific work tools and attachments and attachments Failure to comply to the rated load can cause serious injury death or property...

Page 38: ...n ISO 10567 Lifting capacity of the HX series does not exceed 75 of tipping load with the machine on firm level ground or 87 of full hydraulic capacity The Lift point is bucket pivot mounting pin on t...

Page 39: ...y of the HX series does not exceed 75 of tipping load with the machine on firm level ground or 87 of full hydraulic capacity The Lift point is bucket pivot mounting pin on the arm without bucket mass...

Page 40: ...city of the HX series does not exceed 75 of tipping load with the machine on firm level ground or 87 of full hydraulic capacity The Lift point is bucket pivot mounting pin on the arm without bucket ma...

Page 41: ...This as a preview PDF file from best manuals com Download full PDF manual at best manuals com...

Reviews: