EN - 68
INSTALLATION GUIDE
Installation Procedures
First complete the electrical connections, and then check for correctness.
Reset
When the installation and connections are completed, be sure to press the RESET with a ball-
point pen, etc. Note: Press the RESET button will erase the clock and stored stations.
Installation opening
This unit can be installed in any dashboard having an opening as shown below. The dashboard
should be 4.75mm - 5.56mm thick in order to be able to support the unit.
Important:
Remowe these two screws before instalation. Otherwise, the until will not work.
Inset mounting collar into the dashboard, and bend the mounthing tabs out
with a screwdriver.
Make sure that lock lover is flush with the mounting collar (not projecting outward).
Secure the rear of the unit.
After fixing mounting bolt and power connector, fix the rear of the unit to the car
body by rubber cushion.
Insert trim plate.
1.
2.
3.
Summary of Contents for CRM 2120
Page 74: ...Pozn mky Pozn mky notatky notes...
Page 75: ...Pozn mky Pozn mky notatky notes...
Page 76: ...Seoul Korea...